My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
30909
>
2900 - Site Mitigation Program
>
PR0515699
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 10:44:25 AM
Creation date
9/3/2020 10:35:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515699
PE
2950
FACILITY_ID
FA0012294
FACILITY_NAME
GRANITE CONSTRUCTION CO
STREET_NUMBER
30909
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
25310006
CURRENT_STATUS
01
SITE_LOCATION
30909 S TRACY BLVD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/07/00 MON 10:34 FAX 208 948 0621 KLEINFELDER INC 001 <br /> File No. 2011A� ���21 j <br /> c7 2, 7— cc) <br /> San Joaquin County <br /> Public Health Services Department � <br /> Environmental Health Division <br /> Attn-: �&16 l At 1 <br /> 344 East:Weber Street, Third Floor <br /> Stockton, California 95201 <br /> BYFACY'B&LE: v9) 464-OJ38 or Q P09) 468-3433 <br /> RE: Confirmation of Scheduled Field Inspection <br /> (rMJ=trr..el Cull, rJJ(trc 77A h] �r 1` A-i 411 1 <br /> (AaaraY or l <br /> California <br /> (°i1-'— <br /> CD <br /> (P.r-il W.N Aw1ilobw <br /> Dear YV�i. 11,A � 1 <br /> The purpose of this letter is 10 confirm our conversation bf a,,,m) \�%" ls�_ <br /> in which wc discussed the commencement of drilling for the above-referenced project on <br /> t 2 1 Additionally, it was discussed that the initial field <br /> inspection (of out, bentonite or cuttings, as required by the permit) by your unit will be <br /> �, As you know, based on the <br /> ah"ami Time,— <br /> Progress of the project, additional field inspection may be needed, and can be scheduled between <br /> the PHS/EHA inspector and the Klonfelder Field engineer/geologist during the initial inspection. <br /> We appreciate your attention to this matter. If there are any questions,or if we may be of further <br /> assistance, please contact the undersigned at(209)948-1345. <br /> Ct� � <br /> Respectfully submitted, L <br /> KT FINFELDER, INC. � l <br /> �r' 23b <br /> (Sil9mv) <br /> T�a 1 100 <br /> (Prmted Nemo) �' <br /> FISEM C,roUt InspCG[Ltr_Doc Pug <br /> U:tI.7tHEARDt[�t�CCLIMES�TT1P <br /> Copvnghl 1994,Klemfelder,Inc, 64� <br />
The URL can be used to link to this page
Your browser does not support the video tag.