My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
9015
>
2300 - Underground Storage Tank Program
>
PR0521738
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 12:11:41 PM
Creation date
9/3/2020 10:59:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0521738
PE
2371
FACILITY_ID
FA0014762
FACILITY_NAME
JD Service Station, Inc.
STREET_NUMBER
9015
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
CURRENT_STATUS
01
SITE_LOCATION
9015 WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page s of s) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault,- 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment* 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> r_ _ __ _ _ __ _ _ _ _ _ _ __ _ .. • _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ __ __ _ _ __ _ _ _ _ _ _ _ . _ _ _ __ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ -_ _ _ _ _ _ _ _ _ _ _ - _ . _ _ _ , <br /> I Site Address: t THORNTON CHEVRON 9015 WALNUT GROVE ROAD THORNTON CA 95888 t <br /> CHE`rRON STORE � p <br /> 4444 . . - - - - . . . . . . . . . . . . . . . . . . <br /> 444 . 4 . <br /> . . _ 4444 4444 . . a.. . . . . 4444 . . yV, • . . . - . . . . . . . . 4444 . _ - . - <br /> s. o <br /> *PIPLNVG = p rMf' <br /> (ARROR'S) I . . . . . . . . <br /> Drawing of piping r V <br /> exit of sump and y s <br /> UDC's. No T <br /> underground i. <br /> 21 <br /> ILII cannot speculate _ <br /> t' <br /> blue prints. A } <br /> to <br /> . I f A 1 4 1 1 A 0 1 1 1 1 r I I I w r 1 . . . . . . . . . . . . . . . . . . . . . . . . 41 . . 19 . <br /> IVALNDT GROVE ROAD IsFS <br /> A = Ai NIJI.AR <br /> F = FILLS <br /> T = TURBINE <br /> P = PROBE <br /> V = V.APOR <br /> . . . _ . . . . . . . . _ _ - _ - X = SU1IP SENSOR <br /> . . . . . . . . . . . . . . . . . . . . L =�kJdl.Lt <br /> . r 1l1 = D11nts15. <br /> . I <br /> B =,.I#dut:, Sensor <br /> Arr' item: fnz*rw.rororlthte are not risible to tlr cry-tiAing f'xlarfciat? are a I t Sensor <br /> FariJessictzrlo�irdrnrordr atrlraesde(r',fm ir�ufnnrivfzrigrr�zc�. Drmrh7g S = STP <br /> tut ro scde C = Ftaats & Chafas <br /> Date reap ryas drawn: +V194 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Clearly Aentify locations of the following equipment, if installed: mondor.n0 system control panels: sensors monitor, rig tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other seccndary containment areas: mechanical or electronic line teak detectors: and in-tank liquid lever <br /> probes (if used for leak detecfbn). In the spam provided, note the date this She Plan was prepared. <br /> LEGEND <br />
The URL can be used to link to this page
Your browser does not support the video tag.