My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
0
>
2900 - Site Mitigation Program
>
PR0506078
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 11:24:33 AM
Creation date
9/3/2020 11:07:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0506078
PE
2950
FACILITY_ID
FA0007188
FACILITY_NAME
UNOCAL: UNION ISLAND FIELD
STREET_NUMBER
0
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
STOCKTON
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
TRACY BLVD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING EQUIPMENT <br /> The following monitoring equipment will be used during drilling activities: <br /> Organic Vapor Analyzer _ Microtip w/lamp _ eV <br /> HNu w/lamp _ eV ✓ Organic Vapor Monitor w/lamp 10.0 eV <br /> Explosimeter _ Drager Tube (Type) <br /> (,/) The monitoring equipment must be calibrated in accordance with the manufacturer's instructions or <br /> guidelines found in the Attachments. In addition, the results of daily instrument calibrations shall be <br /> logged in the field log book, or on the Daily Instrument Calibration Check Sheet found in the <br /> Attachments. <br /> GALL1.140 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.