Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM ( Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection ❑x 36 Month Inspection <br /> 1 . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10181339 4/29/19 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> SUPER STOP MARKET <br /> Business Site Address City ZIP Code <br /> 290 N . MAIN ST MANTECA 95336 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification.) Phone # <br /> Edward Stearns (209 ) 744-0112 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 14- 1760 Ex . 09/30/2020 8883080- UT 11 /9/2020 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> FF- EBW , PhikTite & EVR Phase 1 1009893708 Ex 11 /29/2020 OPW 104-635 Ex 3- 14-2020 <br /> Emco 3205 Ex . 11 / 16/2020 ATG : VR A31048 Ex. 8/9/ 19 Incon 1009893708 11 /30/2020 <br /> III . OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method ❑x Manufacturer Guidelines (Specify). <br /> Used : REMOVE AND INSPECT OPW & EMCo <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify): <br /> # of Pages Pag <br /> Attach the inspection procedures and all documentation required to determine the results. Attac6 <br /> TANK ID : (By tank number, storedproduct, etc.) 91 DIESEL 87 <br /> What is the tank inside diameter? (Inches) 95 95 94 <br /> Is the fill piping secondarily contained ? ❑ Yes ❑x No ❑ Yes Z No ❑ Yes R No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained ? ❑ Yes N No ❑ Yes ❑x No ❑ Yes Fx� No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) EMCO M OPW OPW <br /> A 1100 61 SO 61 SO <br /> What is the overfill prevention equipment response ❑x Shuts Off Flow Z Shuts Off Flow ❑x Shuts Off Flow ❑ Shuts Off Flow <br /> when activated? <br /> ❑ <br /> (Check all that apply.) Restricts Flow El Restricts Flow 171 Restricts Flow El Restricts Flow <br /> ❑ AN Alarm ❑ AN Alarm ❑ A/V Alarm ❑ AN Alarm <br /> Are flow restrictors installed on vent piping ? H1 Yes ❑ No Z Yes ❑ No 0 Yes ❑ No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention set $ 4 $ 5 $ 3 <br /> to activate? (inches from bottom of tank.) <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 93 89 92 <br /> Is the overfill prevention in proper operating condition ❑x Yes ❑x Yes ❑x Yes ❑ Yes <br /> to respond when the substance reaches the <br /> appropriate level ? ❑ No (Specify in V.) ❑ No (Specify in V.) ❑ No (Specify in V.) ❑ No (Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results 11:79: Pass ❑ Fail Z Pass ❑ Fail ❑x Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS , r4,� w . <br /> Any items marked "Fail" must be explained in this section. Any additional comments ma"! ode-pt pvid'ed�hero w ' � <br /> VA <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CON TSI , Sf?ECTION <br /> 11 E <br /> t I hereby = � <br /> Division 3 , Crfy that thoverfill hapter 6e Section prevention equipment 2637. 2 and all the information oas n contained herein s accurate' rn,ected in accordance with CaIrpq ,, o Igld gp16t o Title 23, <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = Califomia Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council, ANAudible and usual <br /> = <br />