Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 1 of 6) <br /> Type of Action ❑ Installation Test ❑ Repair Test ❑Six Month Test ❑Q 36 Month Test <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Secondary Containment Test <br /> 10180643 8/6/2019 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Quik Stop #125 -- <br /> Business Site Address City ZIP Code <br /> 1580 W. Main St Ripon 195366 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the ICC Certification) Phone# <br /> Juan Jauregui (916) 372-1888 <br /> Contractor/Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 617238 5246964 8/30/2019 <br /> III. SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br /> TANK ID:(Bytanknumber,stored product,etc.) A Gasoline-87 B Gasoline - 91 C Diesel D <br /> Tank Containment <br /> Tightness Test Result E Pass ❑Fail ❑ NA O Pass ❑Fail ❑NA O Pass ❑Fail ❑NA ❑Pass ❑Fail ❑NA <br /> Product Piping Containment <br /> Tightness Test Result E Pass ❑Fail ❑NA E Pass ❑ Fail ❑NA E Pass ❑Fail ❑ NA ❑Pass ❑Fail ❑NA <br /> Communication Test Result ❑ Pass ❑Fail E NA ❑Pass ❑ Fail E NA ❑ Pass ❑Fail E NA ❑Pass ❑Fail ❑NA <br /> Remote Fill Piping Containment <br /> Tightness Test Result ❑Pass ❑Fail E NA ❑Pass ❑ Fail E NA ❑Pass ❑Fail E NA ❑Pass ❑Fail ❑NA <br /> Communication Test Result El ❑Pass ❑Fail E NA ❑Pass ❑ Fail E NA ❑Pass ❑Fail E NA ❑Pass ❑Fail ❑NA <br /> Vent Piping Containment <br /> Tightness Test Result ❑Pass ❑Fail E NA ❑Pass ❑ Fail E NA ❑Pass ❑Fail E NA ❑Pass ❑Fail ❑NA <br /> Communication Test Result ❑Pass ❑Fail E NA ❑Pass ❑ Fail E NA ❑Pass ❑Fail E NA ❑Pass ❑Fail ❑NA <br /> Vapor Recovery Piping Containment <br /> Tightness Test Result ❑Pass ❑Fail E NA ❑Pass ❑ Fail E NA ❑Pass ❑Fail E NA ❑Pass ❑Fail ❑NA <br /> Communication Test Result ❑Pass ❑Fail E NA ❑Pass ❑ Fail E NA ❑Pass ❑Fail E NA ❑Pass ❑Fail ❑NA <br /> Turbine/Product Piping Sump <br /> Tightness Test Result E Pass ❑ Fail ❑ NA E Pass ❑Fail ❑ NA E Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br /> Fill Riser Sump <br /> Tightness Test Result ❑Pass ❑ Fail E NA ❑ Pass ❑ Fail E NA ❑Pass ❑Fail E NA ❑ Pass ❑ Fail ❑NA <br /> VENT/TRANSITION SUMP ID: a b C d <br /> Tightness Test Result ❑Pass ❑Fail ❑NA ❑ Pass ❑Fail ❑NA ❑Pass ❑Fail ❑NA ❑Pass ❑ Fail ❑ NA <br /> UDC ID: 1 Disp#1-2 2 Disp#3-4 3 Disp#5-6 4 <br /> Tightness Test Result E Pass ❑Fail ❑NA E Pass ❑ Fail ❑NA E Pass ❑Fail ❑ NA ❑Pass ❑Fail ❑NA <br /> UDC ID: 5 6 7 8 <br /> Tightness Test Result ElPass ElFail ❑ NA ❑ Pass ElFail ❑ NA ❑Pass ❑ Fail ❑NA ❑ Pass ❑Fail ❑NA <br /> UDC ID: 9 10 11 12 <br /> Tightness Test Result ❑Pass ❑Fail ❑ NA LEI Pass ED ail ❑ NA ❑Pass ❑Fail ❑NA ❑Pass ❑ Fail ❑ NA <br /> All items marked"Fail"or"NA"must be explained in their respective"COMMENTS"section. <br /> IV. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the secondary containmentwas tested in accordance with California Code of Regulations,Title 23,Division <br /> 3,Chapter 16,Section 2637 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> CERS=California Environmental Reporting System,K=Identification,UST=Underground Storage Tank,ICC=International Code Council,NA=Not Applicable,UDC=Under- <br /> Dispenser Containment <br />