My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 1:47:25 PM
Creation date
9/3/2020 1:26:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM(Page a of 6) <br /> XIII. VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> A ❑ I B ❑ I C I D ❑ <br /> A ❑ I B ❑ I C ❑ I D❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Vapor Recovery Piping Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> Interstitial Communication Verification Method Used: <br /> XIV. COMMENTS <br /> Provide any additional comments here. <br /> XV. TURBINE / PRODUCT PIPING SUMP TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Unknown FRP A ❑X I BXCX D ❑ <br /> A ❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑x Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Turbine/Product Piping Sump Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> ICC-UT UST - Service Technician 8/30/2019 <br /> INCON - Containment Testing 6/6/2020 <br /> INCON - Level 4 Sump Test System Operations 6/4/2020 <br /> XVI. COMMENTS <br /> Provide any additional comments here. <br /> ID=Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.