My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
341
>
2300 - Underground Storage Tank Program
>
PR0231477
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 3:35:54 PM
Creation date
9/3/2020 1:45:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231477
PE
2361
FACILITY_ID
FA0003753
FACILITY_NAME
RIPON SHELL*
STREET_NUMBER
341
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
26114007
CURRENT_STATUS
01
SITE_LOCATION
341 E MAIN ST
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 6 of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment' 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> --- - - - ---- - - -- - -- -- - - - ----- - - - - -- -- -- --- --- '------- - -- P <br /> She Address: I RIPON SHELL 341 MAIN STREET RIPON CA 96366 <br /> *PIPL\G } <br /> . I . . _ . A I (ARROWS) <br /> Drav:ingofpiping - <br /> - exit of sump and <br /> . . . . . . . . . . . . . . . . . I UDC's. Ao <br /> . . _ . . . . . . . . . . . . . . . . . . . . . . . . I <br /> underground <br /> . - - . . . . . . _ . I I dram L accurate, : - - - <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . - - . . . . tre cannot <br /> . . . . . . _ - _ . . . _ . . . . - . . _ speculate blue <br /> • . I . - . - . . . _ . . . . _ . . _ prints. <br /> `. P I <br /> 1 <br /> t <br /> _ _ <br /> I, <br /> KEY <br /> L % � <br /> A = ANNULAR <br /> F = FILLS . . - . . . . STORE F - - - <br /> T = TURBINE <br /> P = PROBE <br /> V= VAPOR <br /> X = SUMP SENSOR <br /> L = LD <br /> B = Brine Sensor - <br /> I = Smart Sensor . I . - • - . . ' . . . - . ' - - - - <br /> S = STP . . . . . . . - . - ' . . <br /> C — Floats & Chaim <br /> E stop <br /> 3tT• irenumrlrgretarltherme nor uiriblstoile, c€ttj6i)Wtahrinarrtrea _ <br /> . - . . ' . - . . . p-rfzsicrnl opirscn mfi• mrlrra sda.�u•for ittfatnnrfcral�npxri. Drenritg <br /> ruito strie ' <br /> Date map was drawn: 20 -9 <br /> I <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it rather than this page, with your Monitoring System Certification. On your sle plan, <br /> show the general layoutef tanks and piping. Clearly identify locations ofihe following equipment, if installed: monitor•"ag system control panels; sensors monflorin2 tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak detectors; and in-tankliquld level <br /> probes (if used for teak detection). In the space: provided, note the date_ this She Plan was prepared. <br /> � I <br /> LEGEND <br /> I �I <br />
The URL can be used to link to this page
Your browser does not support the video tag.