My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2022 11:41:30 AM
Creation date
9/3/2020 4:16:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CGRS <br />c� SOLUTIONS DELIVERED <br />1 <br />Test Certification <br />Post Installation Enhanced Leak Detection (CLD) <br />Location: CGRS Project No : 6-5230-17914-9823 <br />7 -Eleven #38153 <br />121 S. Center Street <br />Stockton, CA 95202 <br />Test Date: April 11, 2019 <br />CGRS Techs: Sergio L. Nunez <br />This document certifies that the UST systems listed below at the above referenced location have been tested <br />and passed the iota® VaporTite V005 tightness test and iotaVisionT" L005. CGRS further certifies that the <br />iota® VaporTite V005 and iotaVision'" L005 meets the post installation testing requirements for post <br />installation testing for newly installed underground storage tank systems as per the California Health and <br />Safety Code, Chapter 6.7, section 25290.1(j)(1). <br />Post Installation ELD Test Results <br />87 Octane Primary Containment System PASS <br />91 Octane Primary Containment System PASS <br />Diesel Primary Containment System PASS <br />IOTA Tech Signature. ' <br />Reviewed by: <br />Sergio L.fNunez CA Tank Tester #06-1727 <br />Chris Murphy <br />of CA Services <br />4/11/2019 <br />Date <br />4/12/2019 <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.