RFORMANCE SPECIFICATION <br />:CTION I GENERAL CONDITIONS SECTION I GENERAL CONDITIONS-CONTINUED SECTION II INSPECTIONS/TESTING <br /> 4RT 1 -GENERAL PART 4-CONTINUED TESTBEFOREPLACIi4S H YSIEMINSERVICE <br /> 1 SCOPE OF WORK:THE WORK INCLUDED IN THE CONTRACT FOR THIS PROJECT CONSISTS OF THE FURNISHING OF ALL 4.11 LIENS:CONTRACTOR SHALL PERMIT NO LIENS OF ANY KIND TO BE FIXED UPON OR AGAINST THE PROPERTY BY ITS Table below lists current Manufacturer's Installation and Testing Guitlelines that may <br /> LABOR,MATERIALS SERVICES.EQUIPMENT AND APPLIANCES REQUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL SUBCONTRACTORS,LABORERS,MECHANICS OR MATERIAL MEN,AND SHALL INDEMNIFY,PROTECT AND SAVE OWNER be applietl b the fuelsystem wmp.... aker assembly butbefore backfilling. <br /> TO THE COMPLETE CONSTRUCTION OF A GASOLINE INSTALLATION FOR 76 FUELING,INC. HARMLESS FROM AND AGAINST ALL SUCH CLAIMS AND LIENS. Be/are the beginning Df fuel system installation,fuel conhaRor Is[D be responsible <br /> SRT 2-AGREEMENT 4.12 EQUIPMENT RESPONSIBILI :COMRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING,RECEIVING,UNLOADING, or reading through the entire Ins allation Manual and OperzmgGuidelinesaswellas <br /> HANDLING AND PROVIDING PROTECTED INSIDE STORAGE FOR ALL OWNER SUPPLIED EQUIPMENT AND MATERIAL. y applicable supplemental materials.It is the responsibility of the fuel contractor <br /> 1 CONTRACTOR SHALL NOT START WORK WITHOUT CONTRACT AND APPROVED SEALED PLANS. CONTRACTOR SHALL INSPECT EQUIPMENT UPON RECEIPT AND IMMEDIATELY REPORT ANY DAMAGE DUE TO SHIPPING TO and fuel Oper tD underrtand and follow all requirements contemed in the <br /> THE OWNER'S REPRESENTATIVE.CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO FAILURE TO COMPLY installation and testing manuals.Work must be performed accortling m standard <br /> SRT 3-INTENT OF DRAWING AND SPECIFICATIONS WITHTHESEREQDIREMENTS.DISPENSERS SHALL BE PROTECTED WITH SHIPPING BOXES UNTIL STORE IS TURNED OVER I durtry.raRices applicableto tank installations and opere[ions.Work mus[alw <br /> FOR OPENING.CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ADEQUATE AND LOCKED STORAGE OF OWNER'S .,Ply <br /> will a11'ppli.bl,wd.;regulationsand standards of appropriate <br /> MISCELLANEOUS EQUIPMENT,TO INCLUDE GASOLINE CONSOLE,PRIOR TO OPENING OF THE STORE. COMPONENT MANUFACTURER governmentiII,ii cies. <br /> I THE INTENT OF THE DRAWINGS AND SPECIFICATIONS!BTO PRESCRIBER COMPLETE WORK OR IMPROVEMENT WHICH THE <br /> 4.13 FU EL CONTRACTOR SHALL BE RESPONSIBLE FOR FILING OF RECEIVING FORMS AND MISCELLANEOUS CONFIRMATION OF INSTALLATION manuawwwzcl.wm/assetsndocuments/library/instailatI"Y" <br /> NTRACTOL SHALL PERFORM IN FULL COMPLIANCE WITH THE CONTRACT DOCUMENTS.THE CONTRACTOR SHALL MANUAL I%20and%20oceraV¢%20Ru tlel %20( RI%20f r% <br /> PERFORM ALL WORK NECESSARY TO COMPLETE THE WORK IN ASATISFACTORV AND ACCEPTABLE MANNER. EQUIPMENT RECEIVING INFORMATION AS REQUIRED BY LOCAL CONSTRUCTION OFFICE. DOUBLE-WALLED STORAGE XERXES"A ZCL 20xerxes%20tanks..di <br /> TANK COMPANY" <br /> THE OCONTRACTOR NSHALL,RUCTIPONDISCOVERV,REPORTANY DISCREPANCIES IN THE DRAWINGS AND SPECIFICATIONS TO 4.14 SUPPLIED <br /> LCONTQUIPME T.INCLUDE <br /> EY PIPING,WIRING,LFORINSAND TIONLABOR OF OWNER REQUIRED TO ID EQUIPMENT <br /> MEN U TESTING http://wwwzcl.wm/assets tlocu 15/I'b /I stall tl %20 <br /> THE OWNER'S CONSTRUCTION MANAGER. SUPPLIED EQUIPMENT.INCLUDE MONEY IN BID PROPOSAL FOR INSTALLATION OF OWNER SUPPLIED EQUIPMENT UNLESS PROCEDURE manual%20and%20operatin 20Ru del %20( oRl%20for% <br /> NOTEDOTHERWISE. 20xerxe5Y620[anks.Ddf <br /> 3 THE DRAWINGS TIoNSAAND SPECIFICATIONS ARE INTENDED,OR SHOWN ON HERR WIN 8NNDN MENTIONED TIONED <br /> SPECIFICATIONSA HALL BE <br /> ELIKOWN EFFEcTN THE RAWINGO N OR <br /> IO THEN BOTH.GENER NOT MHE sPEEDINTI INSTALLATION http://www.nov.com/Se¢ments/Co I tl d P d Ct' <br /> SPECIFICATIONS,SHALL BE OF LIKE EFFECTAS IF SHOWN OR MENTIONED IN BOTH.GENERALLY,THE SPECIFICATIONS PART 5-PROTECTION DOVeIE-WALLED PIPING NOV MANUAL Soluhons/Fiber Glass Sys[ /F I H dl'¢/R d Th d IIA. <br /> DESCRIBE WORK WHICH CANNOT BE READILY IDENTIFIED ON THE DRAWINGS AND INDICATED TYPES,QUALITIES AN 3 <br /> METHODS OF INSTALLATION OF THE VARIOUS MATERIALS AND EQUIPMENT REQUIRED FOR THE WORK.IT IS NOT INTENDED 5.1 CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY LOSS OR DAMAGE CAUSED BY HIM OR HIS WORKMEN TO THE TESTING <br /> TO MENTION EVERY ITEM OF WORK IN THE SPECIFICATIONS WHICH CAN BE ADEQUATELY SHOWN ON THE DRAWINGS NOR PROPERTY OR EQUIPMENT OF THE OWNER,OR TO THE WORK OR MATERIALS OF OTHER CONTRACTORS. PROCEDURE http://www.nov com/docHarMl 7D Id=12bNi IC3 L35C <br /> TOF O SHOW NATURE DRAWINGS ALL ITEMS E WORBEEN <br /> SHSCRIBEDOR REQUIRED BY TERUHS RL_AE SPECIFICATIONS RKWHVEN IF THEY ARE SHALL MAKE GOOD ANY LOSS,DAMAGE OR INJURY WITHOUT COSTTO OWNER FOR SUCH LOSS OR DAMAGE. INSTALLATION http://www.¢ilbarw wm/old/Rld til' ¢] <br /> SHOWN NATURE <br /> DRAWINGS <br /> OR IS RE SON BLY I S INFERABLE <br /> S REIN.ALL MATERIALT OPRODUC FOR WORK JOB S S MANUAL id-361 <br /> PROVIDED BY <br /> THEEDRAONTRA ORR REASONABLY INF THEW R BEINGNECESSARYCOVERED IN THE <br /> ESPECISHED JOB SHALL BE 5.2 CONTRACTOR AND HALL <br /> REQUIREDAND By SUITABTEMPORARY INTERFERE WITH <br /> TRAFFIC IN <br /> OR OTHER LEAK DETECTION SENSOR VEEDER ROOT <br /> PROVIDED BY THE CONTRACTOR WHETHER OR NOT THE WORK IS EXPRESSLY COVERED IN THE SPECIFICATIONS. STRUCTURES AND DEVICES AS REQUIRED BY LAW,DO NOT OBSTRUCT OR INTERFERE WITH TRAFFIC IN PUBLIC STREETS, TESTING http://www.Rllbarw wm/gold/ tl til' cf 7 [I <br /> ALLEYWAYS OR PRIVATE RIGHT-OF-WAYS.IF WORK IS SUSPENDED,KEEP ALL ROADWAYS AND SIDEWALKS IN PROPER PROCEDURE Itl-361 <br /> THE CONTRACTOR,SUBCONTRACTORS AND ALL TRADES SHALL EXAMINE THE SITE AND ASCERTAIN EXISTING CONDITIONS CONDITION AND PUT AND LEAVE THEM IN PROPER CONDITION AT TERMINATION OF WORK, <br /> PRIOR TO THE START OF THEIR PORTIONS OF THE WORK.BEFORE ORDERING MATERIALS OR DOING MY WORK,THE INSTALLATION http://www.Rilbamo wm/o,d/g Id bT d 7 cti <br /> CONTRACTORENCES SHALL VERIFY AND BE RESPONSIBLE FOR THE CORRECTNESS OF ALL MEASUREMENTS AT THE SITE.ANY 5.3 CONTRACTOR SHALL SEND PROPER NOTICES,MAKE NECESSARY ARRANGEMENTS AND PERFORM ALL WORK REQUIRED MANUAL id`364 <br /> IC <br /> SHOPDIFFEDRAWINGS <br /> SH AY BE FOUND BETWEEN ACTUAL DIMENSIONS AND DIMENSIONS INDICATED ON THE DRAWINGS OR FOR THE CARE,PROTECTION AND MAINTENANCE OF PUBLIC UTILITIES ON AND AROUND THE BUILDING SITE,ASSUMING ALL AUTOMATIC TANK GUAGES VEEDER ROOT <br /> SHOP DRAWINGS SHALL BE SUBMITTEDTO THE OWNER'S CONSTRUCTION MANAGER FOR CONSIDERATION BEFORE RESPONSIBILITY AND PAYING ALL COSTS FOR WHICH THE OWNER MAYBE LIABLE.CONTRACTOR HEREBY DECLARES HE TESTING <br /> PROCEEDING WITH THE ACTUAL DIMENSIONS AND MEASUREMENTS INDICATED ON THE DRAWINGS UNLESS A SUBSTANTIAL HAS VERIFIED THE LOCATIONS OF THE EXISTING UNDERGROUND UTILITIES ON SITE PRIOR TO THE START OF WORK. PROCEDUREh�a:// 'w'veeder com!/p d c[/tl [ tl[a k g <br /> ERROR HAS BEEN MADE.IF SUCH AN ERROR SHOULD OCCUR,IT SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER'S CONTRACTOR HEREBY AGREES TO MAKE ARRANGEMENTS FOR AND TO PAY ALL CHARGES IN CON-JUNCTION WITH THE [ems/atR-tlsconwles/[Is-350- [I- kq <br /> CONSTRUCTION MANAGER AND RESOLVED BEFORE PROCEEDING WITH WORK. RELOCATION'S OF EXISTING UTILITIES AS REQUIRED.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL UTILITY INSTALLATIONwww.opwglobalwm/do/I'b / Is/[a'I-N I' <br /> EASEMENTS,HOOKUP CHARGES,TAP FEES&SYSTEM DEVELOPMENT FEES OR BONDS AS NECESSARY FOR COMPLETION MANUAL ^&/below-ground/opw-fcsman /]I s/mabl-Ih15524p1 <br /> THE ORGANVATION OF SPECIFICATIONS INTO DIVISIONS,SECTIONS AND PARAGRAPHS,AND THE ARRANGEMENT OF THE OF THIS PROJECT. OVERFILL PREVENTION DEVICES OPW 1-3014.ptlRsfvrsn-0 <br /> DRAWINGS ARE NOT INTENDED TO CONTROL THE CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN <br /> THE ESTABLISHING THE EXTENT OF WORK TO BE PERFORMED BY ANY TRADE. 5.4 IF ALL OR PART OF THE WORK IS SUSPENDED FOR ANY REASON,CONTRACTOR SHALLPROPERLY COVER OVER,SECURE TESTING http://www.opwRlobalwm/d /I'b is/ I/[a'I htT <br /> AND PROTECT ANY PORTION LIABLE TO SUSTAIN INJURY FROM ANY CAUSE. ^&/below-Rround/o.w-lcs-m /]I t [abl-Ih15524p1 <br /> DRAWINGS AND SPECIFICATIONS:DRAWINGS INDICATE GENERAL DESIGN AND ARRANGEMENTS DRAWINGS ARE PROCEDURE 1-30-14.pdf75fvrsn=4 <br /> DIAGRAMMATIC AND ARE NOT SCALED FOR DIMENSIONS.TAKE ALL DIMENSIONS FROM ARCHITECTURAL PLANS AND Ss PRO DUCT PROTECTION:CONTRACTOR SHALL PROVIDE ADEQUATE AND SECURE PROTECTION OF PRODUCT IN TANKS <br /> EQUIPMENT TO BE FURNISHED.VERIFY DIMENSIONS IN THE FIELD. UPON DELIVERY UNTIL TURNED OVER FOR OPERATION.ALL FILL,VENT AND GAUGING CAPS ANDIOR OPENINGS SHALL BE htta://www.opwglobalwm/tlo/I'b <br /> SECURED AND PADLOCKED TO PREVENT VANDALISM OR THEFT. INSTALLATION ^&/below-ground/it,-ksmanu saw Th`ad-0 II <br /> MANUAL Spill Installation Ins[202181 2-13-13 G...lstat -M ste& <br />,RT 4-RESPONSIBILITY OF THE CONTRACTOR <br /> SPILL-CONTAINMENT NT sfvrsn-0 <br /> PART 6-SUBSTITUTION OF MATERIALS M"""°`� °PW <br /> TESTING http://www.00w¢lobal com/. <br /> CONT RACTOERSTANHEREBY DECLARESHE HAS READ ALL SPECIFICATIONS AND EXAMINED THE DRAWINGS AND 6.1 MATERIALS AS SPECIFIED REPRESENT REQUIRED STANDARDS.SUBSTITUTION MAYBE PROPOSED IN WRITING WITH PROCEDURE ^&/below-ground/opw-fcs-m I/O til WIIS'llC <br /> THAT HE UNDERSTANDS ALL CONDITIONS. AD EQUATE SUPPORTING DATA FURNISHED,USE OF SUBSTITUTE MATERIALS IS DEPENDENT ON RECEIPT OF WRITTEN a Vac Tes[Ins[allahon lnsVucbons-En ITh 202383 dfl5[ <br /> us-Master&sfvrsn=D <br /> CONTRACTOR HEREBY DECLARES HE HAS VISITED THE SITE AND IS FAMILIAR WITH THE CONDITIONS APPROVAL FROM OWNER'S APPROVED REPRESENTATIVE, <br /> AFFECTING THE WORK.NO ALLOWANCES SHALL HIS <br /> MADE SUBSEQUENTLY ON BEHALF OF T THE INSTALLATION http://www.opwglobal com/d /Iib / 1/['I f I' <br /> CONTRACTORFORANY EHE SITE RE FON ON BE HIS PATERIART.IF L-THEPERENT FROM THOSE I CONTRACT, PART 7-COMPLETION OF CONTRACT MANUAL 1 .g d/ S ' E rg She <br /> BY THE DFADINGSANT THESITEFOUNDTONOWN CONDITIONS <br /> DIFFERENTLLY INDICATED Valve Installation InrtluRlons-En hH313]4PA df75t <br /> BY 5 CHARACTER SHOWN AND <br /> OR HE ATTENTION OF <br /> UNUSUAONSTRUCTIO IN WORK OF BE IMPACTVALVES opw otos-Master&sfvrsn=0 <br /> THISCHARALLED SHOWNAND STO SUHCONITTENTIONORE THEY <br /> CONSTRUCTION MANAGER 7.1 THE CONTRACT SHALLRKHASBENCOMPLETRED ED,SAVEIN PROVIDEDIN My OAND MAINTENANCE MADE ATI ONS ABONDPPLICABLE <br /> OR BY <br /> SHALL BE CALLED IMMEDIATELY TO SUCH CONDITIONS BEFORE THEY ARE DISTURBED. GOVERNILAW,WHNG <br /> N BUILDILL NG <br /> GDEP DEPARTMENTS, <br /> MARSHALLS <br /> FINAL OTHER JURISDICTIONS, <br /> AND ACCEPTANCE MADE BY ALL APPLICABLE �://www.opwRlobalwm/d /I'b d / Is/[al-fo l' <br /> GOVERNING BUILDING DEPARTMENTS,FIRE MARSHAL'S OR OTHERJURISDICTIONS. TESTING ^&/below-Rround/apw-fcs-m I/lO Se' E <br /> CONT REACTOR HEREBY DECLARES THAT HE HAS READ AND IS FAMILIAR WITH THE APPLICABLE SOILS <br /> PROCEDURE ar Valve_Ins[allabon InslrucYi E RI h H113]4PA dfl5[ <br /> REPORT. ].2 NOT USED <br /> otos=Master&sfvrsn=0 <br /> ].3 CLEANING: INSTALLATION http://www.vaporless com/'^stall[I /' [II df/' [ll Id200 <br /> NSRACTOR FOLLOWING <br /> ALL <br /> STRICTLYADHERINGNOTED THEREIN,ERECOMMEN WATESTA SAID MECHANICAL UNE LEAK VARORLESS MANUAL O.pdf <br /> POSSIBLYOTERMINE A DIFFERENT TILLEAPROOF CEDHE TNK STRAPS ANDEPEOFBACK GWATER TABLE SHALL ].3.1 ALL WORK SHALL BE CLEAN AND READY FOR USE UPON COMPLETION.REMOVE TEMPORARY TAPES, DETECTORS MANUFACTURING TESTING �://www,vaporless wm/Inrt LIC <br /> POSSIBLY SEOUL GROUDWAT TUTILIZATIONINTION BE DSTRAPSEDDURING TANK <br /> NKEXCLL /' tall tlf/I II Itl200 <br /> WORK HALLS SUSPENDED <br /> WATEROREVIEW BY76F EL DISCOVERED ION MANAGER, <br /> WRAPPING,COATING,PAPER LABELS AND OTHER ITEMS. PROCEDURE 0.pd <br /> WORK SHALL BE SUSPENDED PENDING REVIEW BY]6 FUELING CONSTRUCTION MANAGER. <br /> 7.3.2 CLEANING METHODS FOR PROPRIETARY MATERIALS SHALL BE IN STRICT ACCORDANCE WITH INSTALLATION <br /> MANUFACTURER'S INSTRUCTIONS.CLEANING SOLUTIONS,AGENTS,SOLVENTS,WAXES OR OTHER ELECTRONIC LINE LEAK VEEDER ROOT MANUAL htt://www.veeder.wm/gold/download.cfm7tloc_id=6414 <br /> ONSTRUCTIONSHOTRACTOR SHALL REPORT ANY OBJECTION TO MATERIALS,APPLIANCES,OR METHODS OF MATERIALS SHALL BE ONLY AS APPROVED BY THE MANUFACTURER OF THE MATERIAL INSTALLED IN DETECTORS TESTING <br /> CONSTRUCTION SHOWN OR SPECIFIED TO THE OWNER'S CONSTRUCTION MANAGER AND OBTAIN A THE WORK. PROCEDURE http://www.veetler com/oltl/tl dcf]d 'd-6414 <br /> DECISION BEFORE PROCEEDING. <br /> ].3.3 CLEANUP:CONTRACTOR SHALL CLEAN UP ALL DEBRIS CAUSED BY THE WORK OF THIS SECTION, FLEXIBLE CONNECTORS FRANKLIN INSTALLATION hLtpc%/nwwff kslinfuDel'Aecom/mdi/4MW/40729Mol-,l- <br /> PROPOSALS:CONTRACTOR SHALL SUBMIT BID ONLY ON 76 FUELING'S FORM THAT WILL BE PROVIDED BY FUELING MANUAL k - ct-i tail tlf <br />]6 FUELING'S LOCAL CONSTRUCTION MANAGER,"COST OF CONSTRUCTION"PROPOSALS SUBMITTED ON ANY KEEPING THE PREMISES NEAT AT ALL TIMES, <br /> OTHER FORM SHALL BE REJECTED AND RETURNED.PROPOSALS NOT COMPLETELY AND PROPERLY FILLED <br /> OUT SHALL BE REJECTED.PROPOSALS SHALL INCLUDE MONEYS FOR REMOVAL OF ALL EXISTING PART 8-CODES �/L <br /> IMPROVEMENTS AS REQUIRED FOR GASOLINE INSTALLATION, PART 1 -GENERAL <br /> PERMITS:CONTRACTOR SHALL,AS DIRECTED BY 7S FUELING,PAY FOR ALL APPLICABLE PERMITS AND AND FEES.COPIES <br /> 8.1 THE FOLLOWING CODES ARE MADE A PART OF THIS SPECIFICATION.SAID CODES SHALL DICTATE MINIMAL ACCEPTABLE 1.1 SCOPE:THIS SECTION COVERS THE FURNISHING OF ALL LABOR,SERVICES AND EQUIPMENTAS RE <br /> PERMIT$AND CERTIFICATES SHALL BE FORWARDED TO LOCAL 76 FUELING CONSTRUCTION MANAGER'S OFFICE OR SITE STANDARDS.CODE SHALL BE ADHERED TO UNLESS LOCAL GOVERNING AUTHORITIES DICTATE HIGHER OR MORE INSPECTION SERVICES OF THE FUELING INSTALLATION. OU RED TO PROVIDE <br /> MANAGER PRIOR TO COMMENCEMENT OF WORK,FINAL CERTIFICATION OF ACCEPTANCE BY GOVERNING STRINGENT REQUIREMENTS WHICH SHALL TAKE PRECEDENCE: <br /> HORITIES SHALL ALSO BE ON FILE WITH LOCAL CONSTRUCTION OFFICE OR SITE MANAGER PRIOR TO THE <br /> CESSING OF FINAL PAYMENT REQUEST. 8.1.1 NFPA 30 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE PART 2-INSPECTIONS <br /> INSPECTIONS:CONTRACTOR SHALL BE REQUIRED TO ADHERE TO ALL REQUIREMENTS OF OWNER'S INSPECTION 8.1.2 PEI MANUAL"RECOMMENDED PRACTICES FOR INSTALLATION OF UNDERGROUND LIQUID STORAGE 2.1 INSPECTOR:76 FUELING,INC.LOCAL CONSTRUCTION DEPARTMENT AND/OR APPOINTED REPRESENTATIVE SHOULD BE <br /> PROGRAM.CONTRACTOR SHALL COMPLY WITH REQUIREMENTS FOR NOTIFICATION,SITE PREPARATION REQUIREMENTS, SYSTEMS"I_ <br /> (OR LATEST EDITION) NOTIFIED TO OBSERVE TIGHTNESS TESTING OF PRODUCT PIPING,STAGE I&STAGE II PIPING PRIOR TO BACKFILL. <br /> COMPLIANCE,ONSITE PRESENCE DURING INSPECTION AND CORRECTION IC ANY DEFECTS OR RELATED PROBLEMS As TS <br /> DIRECTED BY INSPECTING REPRESENTATIVE CONTRACTOR SHALL PROVIDE NO LESS THAN 48 HOURS NOTICE PRIOR TO 8.1.3 OSHA AND LOCAL MUNICIPALITIES <br /> INSPECTION. 48 2.2 NOTIFICATION:CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING 76 FUELING'S CONSTRUCTION DEPARTMENT HOURS PRIOR TO REQUESTED INSPECTION <br /> COORDINATION:FUEL CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING ALL PHASES OF THE GASOLINE PART9-WARRANTY/GUARANTEE 2.3 SPILLAGE:SHOULD SPILLAGE OF PRODUCT OCCUR AT ANY PHASE OF INSTALLATION OR TESTING,LOCAL].FUELING <br /> INSTALLATION WITH THE GENERAL CONTRACTOR IN CHARGE OF THE BUILDING OR MAJOR PORTION OF THE PROJECT.THE CONSTRUCTION DEPARTMENT AND ENVIRONMENTAL DEPARTMENT ARE TO BE NOTIFIED IMMEDIATELY,ESTIMATED LOSS <br /> BUILDING GENERAL CONTRACTOR AND THE FUEL CONTRACTOR SHALL JOINTLY DEVELOP A MUTUALLY AGREEABLE 9.1 EXCEPT WHERE SPECIAL GUARANTEES ARE REQUIRED IN EXCESS OF ONE(1)YEAR,THE CONTRACTOR AGREES TO REPAIR OF PRODUCT AS WELL AS ACTION TO BE TAKEN BY CONTRACTOR TO SAFEGUARD THE EVENT FROM FURTHER MISHAP <br /> SCHEDULE AND TIMETABLE FOR COMPLETION ON THE GASOLINE INSTALLATION.TIMETABLE FOR BUILDING AND GASOLINE TO PROTECT THE GENERAL PUBLIC IS TO BE NOTED AND RECORDED. AND <br /> AND RE-CERTIFY OR REPLACE THE DEFECTIVE COMPONENT W ANY DEFECT IN MATERIAL OR WORKMANSHIP(BEYOND <br /> SHALL COINCIDE AND COMPLIMENT EACH OTHER SO THAT ONE DOES NOT DELAY THE OTHER. ORDINARY WEAR AND TEAR)TO THE SATISFACTION OF THE OWNER'S CONSTRUCTION MANAGER FOR A PERIOD OF ONE(1) <br /> SHOULD FUEL CONTRACTOR FAIL YE AR AFTER DATE OF ACCEPTANCE,WHETHER IN HIS WORK OR IN THAT OF SUBCONTRACTOR'S,WITHOUT COST TO THE 2.4 REPRESENTATIVE OF CONTRACTOR AND FUEL CONTRACTOR SHALL BE AVAILABLE ON SITE DURING TESTING PROGRAMS. <br /> COMPLETION OF THE OVERALL BUILDING PROJECT,78 FUELING, <br /> ESTABLISHED SCHEDULE ANDELING,INC.RESERVES THE RIGHT TO RECTIFY <br /> HOLDUP THE OWNER. FAILURE TO COMPLY WITH THIS REQUIREMENT WILL RESULT IN ANY CORRECTIONS AND/OR REPAIRS REQUIRED BEING <br /> LMEET TIFY THE SITUATION <br /> ACCORDINGLY. WN <br /> PERFORMED By OWNER AS REQUIRED.COST OF SAID REPAIRS AND/OR CONNECTIONS SHALL BE DEDUCTED FROM <br /> 9.2 ALL PAVING WILL HAVE A TWO YEAR WARRANTY, CONTRACT AMOUNT AS REQUIRED TO SATISFY THE SITUATION. <br /> CONTRACTOR SHALL PROVIDE OWNER WRITTEN CERTIFICATION AS TO THE FOLLOWING: 25 PROHIBITED WORK:CONTRACTOR SHALL SCHEDULE WORK SUCH THAT NO HEAVY EQUIPMENT IS OPERATING ON SITE r <br /> DURING INSPECTION PROGRAMS.NO WELDING OR OPEN FLAMES SHALL BE ALLOWED ON SITE AT TIME DURING TEST <br /> 49.1 CERTIFICATION FROM LOCAVSTATE GOVERNING AUTHORITIES AS APPLICABLE FOR CONTRACTOR PART 10-AS BUILT PLAN AND DOCUMENTATION PROCEDURES. L <br /> CERTIFICATIONILICENSING FOR INSTALLATION OF GASOLINE STORAGE TANK SYSTEM. <br /> 2.8 INSTALLATION REPORTS:SHOULD 76 FUELING OR THEIR APPOINTED REPRESENTATIVES BE UNABLE TO BE PRESENT AT <br /> 4.9.2 CATGIS,ETC.)ERTIFICATION TO ATTENDING <br /> MANUFACTURES ANDATION FROM <br /> (TANKS,PRODUCT LINES, 10.1 UPROVEMENTSINLU PROJECT,CONTRACTOR,PIPINPROVIDE,PLUM PLUMBING <br /> ELECTRIC- <br /> INSTALLATION <br /> PLAN"VERIFYING FINAL LOCATION OF SITE FOR PURPOSES OF FILING ANY INSPECTION REPORTS,CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE <br /> INSTALATION OF EQUIPMENT,ANDACHIEVINGCERTIFICATION FROM APPROPRIATE COMPANY FOR IMPROVEMENTS INCLUDING,BUT NOT LIMITED TO,PIPING,PLUMBING AND ELECTRICAL. INSPECTION AND FILING OF REPORT WITH LOCAL].FUELING,INC.CONSTRUCTION OFFICE.WRITTEN REPORT SHALL <br /> INSTALLATION OF EQUIPMENT. 10.2 CONTRACTOR SHALL KEEP PHOTOGRAPHIC JOURNAL OF ALL PHASES OF THE COMPLETE INSTALLATION.PHOTOGRAPHS INCLUDE PHOTOGRAPHIC DOCUMENTATION OF ALL PROCEDURES. <br /> 4.93 CERTIFICATION ON APPROPRIATE FORMATAS TO INSTALLATION OF COMPLETE SYSTEM BEING ARE TO BE PROPERLY DATED,IDENTIFIED AND FORWARDED TO LOCAL 76 FUELING,INC.CONSTRUCTION OFFICE,WITH 2.] TEST FAILURE:SHOULD SYSTEM FAIL ANY PORTION OF TEST PROGRAM,CONTRACTOR SHALL IMMEDIATELY INSTIGATE <br /> PERFORMED IN COMPLIANCE WITH ALL LOCAL,STATE AND FEDERAL LAWS AND REGULATIONS. FINAL INVOICE PACKAGE. PROCEDURES AS REQUIRED TO BRING SYSTEM INTO COMPLIANCE SHOULD FAILURE OF TEST DUE TO FACILITY WORK <br /> EITHER REQUIRE EXPENDITURE OF ADDITIONAL MONIES FOR RESCHEDULING ANDIOR RETESTING OF SYSTEM,CONTRACTOR <br /> 4.9.4 INSTALLED <br /> RE'S SPECIFICATIONS <br /> SUPPLIED ON EL CONTRACTOR HAS BEEN SHALL BE HELD RESPONSIBLE FOR COMPENSATION ACCORDINGLY. <br /> INSTALLED AS PER MANUFACTURER'S SPECIFICATIONS BV PERSONNEL TRAINED AND QUALIFIED <br /> FOR THAT SPECIFIC ITEM. 2.8 CLEANUP:IN THE EVENT PRODUCT SPILLAGE SHOULD OCCUR DURING CONSTRUCTION OR DURING WARRANTY PERIOD <br /> DUE TO WORK PERFORMED By CONTRACTOR,CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP AS MAY BE REQUIRED, <br /> 2.9 TEST REPORT:UPON COMPLETION OF TESTING PROGRAMS,REPRESENTATIVE OF TESTING!INSPECTION COMPANY SHALL <br /> BE RESPONSIBLE FOR FILING COPIES OF TANKAND PIPING TEST/INSPECTION REPORTS WITH LOCAL 76 FUELING,INC. <br /> P <br /> CONSTRUCTION OFFICE OR THE OWNER'S ASSIGNED SITE MANAGER WITH COPY TO JOB SITE. <br />