Laserfiche WebLink
COMPANY: LODI 76 DATE OF QUOTATION QUOTE NUMBER <br /> PROJECT: JOB SITE NAME 04/09/18 0 <br /> OTY Part Number DESCRIPTION UNIT PRICE EXTENDED <br /> Please note:Installation and use of all above-ground fuel storage systems carry inherent risks and are subject to regulations and standards established <br /> by Federal,State and Local agencies such as the EPA,Building and Fire authorities etc. By signing this document,customer accepts full responsibility <br /> for investigation and implementation of technologies required to meet any applicable regulations and requirements related to the parts and or system(s) <br /> in this proposal.Customer also accepts full responsibility for any decision to comply or to not comply with applicable rules and regulations.Furthermore, <br /> by signing this document,customer agrees to hold harmless and defend Northwest Pump&Equipment Co.and its affiliates from any liability,penalty or <br /> disciplinary action that may occur as a result of decisions by customer,their employees or contractor's to ignore,circumvent or otherwise fail to obey <br /> any and all applicable federal,state and local rules and regulations and standards of good,safe,practice. Customer Initials: <br /> Merchandise Returns:New Unused Stocking items must be returned within 30 days of the original purchase for full credit. Special ordered items will <br /> be charged a minimum 25°%restock fee if returned new unused.Cores must be returned within 20 days of the original purchase for full credit. <br /> PCI Compliance Disclaimer:It is solely the Customers responsibility to verify PCI Compliance and Network Processing Compliance with their Merchant <br /> Provider.NWP will not be liable for direct,special or consequential damages,business interruption or loss of profits,sustained by Customer or any party <br /> claiming by,through or under the Customer. <br /> Above Specifications Exclude the Following(Unless Otherwise Noted): Plans,Permits,Inspection,All Testing,Labor to Assemble or Install, <br /> Miscellaneous Pipe Fittings and Accessories,Any Electrical Consideration,Offloading or Setting Any Equipment or Tank, Site Improvements, Guard <br /> Barriers, Any Other Items(s)Not Specifically Mentioned Above <br /> Equipment Only: No Installation.Subject to engineer's approval. This quotation does not include or imply any equipment or quantities other than listed <br /> herein. Contractor to determine actual quantities required. No retainage to apply. <br /> Performance: Performance of equipment listed is based upon the accuracy of the information supplied to NW Pump <br /> and Equipment Co.by the customer or customer's engineer.Guarantee of performance may require approval by a <br /> licensed engineer at the customer's expense.NWP is not responsible for any warranty outside of standard manufacturer <br /> warranties. <br /> Tank Submittal Drawings: Tanks require approved,signed drawings before production of the tank may begin.Any quoted lead time is based on <br /> production time required once approved submittal drawings have been received by Northwest Pump&Equipment. <br /> Verifone Terms: Special terms apply to the Verifone Equipment. Prices reflect a 3%cash discount. Payments must be received within 10 days of <br /> invoice.3%will be added to invoice and may be deducted if paid within 10 days.Credit card payment not applicable with these terms. Initials <br /> Gilbarco/Gasboy Terms: Special terms apply to the Gilbarco/Gasboy Equipment. Prices reflect a 3%cash discount. Payments must be <br /> received within 10 days of invoice. Invoices are sent upon completion of the order at the factory.3%will be added to invoice and may be <br /> deducted if paid within 10 days.Credit card payment not applicable with these terms.Initials <br /> **60 month lease option for this project shown above. Actual monthly payment is calculated by Patriot Capital Corporation and is subject to their <br /> qualifications to acquire this lease payment structure.Lease is structured with a One Dollar Purchase Option,ownership of the equipment takes place at <br /> the end of the lease term. For more information,contact Geoff Smith at 415-550-8951 <br /> Page 3 of 3 <br /> Northwest Pump Equipment Co. <br />