Laserfiche WebLink
Project Title: 7-Eleven Fuel Tanks <br /> Discipline:Structural <br /> CULLUMBER ENGINEERING <br /> Project No.: CN1117 Originator: C.Dilworth I Date: 1 5/17/2018 <br /> omponent:I Buoyancy Calculations I Checked: W.Cullumber Date: 5/17/2018 <br /> Min.Temp.Reinforcement(Longitudinal) <br /> Area of Conc.= 5184 in^2 <br /> Min.reinforcement=0.0018*Ac <br /> Min.reinf.= 9.3312 in^2 <br /> Area#5 Bar= 0.31 in^2 <br /> Number of#5 bars= 30.10 bars total <br /> Top Mat= 16 bars <br /> Bottom Mat= 16 bars <br /> Spacing Top= 9 in o.c. <br /> Spacing Bottom= 9 in o.c. <br /> The contractor shall install(2)mats of#5 bars @ 9"ox.top and bottom in the longitudinal <br /> direction of Deadman slab <br /> PROPRIETARY AND CONFIDENTIAL- DO NOT COPY 10 of 10 <br />