My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•~ CG R5 <br /> SOLUTIONS DELIVERED <br /> iota <br /> ENHANCED LEAK DETECTION <br /> May 1, 2019 <br /> Site Location <br /> 76 <br /> 141 E. Harney. <br /> Lodi, CA 95240 <br /> Subject: Work Plan for IOTA VaporTite Pre and Final ELD Testing Services <br /> To Whom It May Concern: <br /> CGRS is pleased to present you with this work plan for pre and final enhanced leak detection (ELD)testing services <br /> for your project at the above referenced location. CGRS will utilize the iota VaporTite V005 (LG 113) to perform <br /> the final ELD post installation test as required by the State of California. This test method has been evaluated by <br /> the California State Water Resource Control Board and determined to meet the performance requirements for <br /> post installation ELD testing(see LG 162-3 attached). <br /> O Pre Testing will be performed on the primary containment portion of the fueling system with the IOTA <br /> test method while the tank top and product, vent and vapor piping is exposed, prior to backfilling. Any <br /> problems encountered during the pre-testing will be addressed bythe installation contractor and retested <br /> by CGRS the testing crew. <br /> O Final ELD testing will be performed on all primary fuel containment system components once the fueling <br /> system has been completed (everything below grade surface)backfilled, concrete poured, and the system <br /> is essentially ready to receive fuel.This will provide the installation contractor,general contractor, design <br /> engineer, site owner and operator with third party certification that the system is "vapor tight" before it <br /> ever receives fuel. <br /> CGRS holds a current California Contractors License with a Hazardous Materials endorsement. All final ELD testing <br /> will be performed by a certified IOTA technician holding a current California Tank Tester license. <br /> If you have any questions regarding any aspect of this work plan, please don't hesitate to contact me at 1-800288- <br /> 2657. <br /> Sincerely, <br />
The URL can be used to link to this page
Your browser does not support the video tag.