My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix A <br /> 71 SO Overfill Valve Upper Tube Calculation Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion(AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Desired tank capacity for shut-off: SO%= ��S`I'o <br /> Dipstick Number on Tank Chart that corresponds to 100%volume(Y)_ Ti s 7 (Y) j <br /> Dipstick Number on Tank Chart that corresponds to SO%(X)= N <br /> Upper Tube Reference Number Z=Y-X 2 (Z) <br /> Upper Tube Depth Inside Tank C=Z-2" <br /> Distance from top sealing surface for 71 SO Lip'to inside the - (C) <br /> top of Storage Tankz A= <br /> For Non-Testable 71 SO models only <br /> In all cases for non-testable 71 SO models,the top of the valve body must protrude at least 6 1/2"into the tank to <br /> provide a minimal clearance for proper operation.' Additionally the total Upper Tube Length must beat least 16" <br /> of length to include the protective bend in the tube. <br /> Is C less than 6 1/z" Yes / <br /> If NO,Upper Tube Length(D)=C+A <br /> If YES,Upper Tube Length(D)=6 1/2"+A <br /> I <br /> Upper Tube Length= <br /> I <br /> For Testable 71 SO models only <br /> In all cases for Testable 71 SO models,the top of the valve body must protrude at least 6 1/2"into the tank to provide <br /> a minimal clearance for proper operation 3 Additionally the total Upper Tube Length must be at least 14 1/2"of <br /> length to include the protective bend in the tube. <br /> Is C less than 5" Yes / No <br /> If NO,Upper Tube Length(D)=C+A-1 '/2" <br /> If YES,Upper Tube Length(D)=6 1/2"+A- 1 1/2" <br /> Upper Tube Length= j <br /> I <br /> Sealing surface may be the top of the Face Seal Adaptor,the built in sealing ledge inside some spill containers,or on non-vapor <br /> tight applications the top of the pipe nipple <br /> z Some Underground Storage tanks utilize am an way system at the top. Make sure to use the top of the storage tank for measure- <br /> ment and not to top of the manway, Consult your underground tank manufacturer for height of the manway <br /> 3 This measurement is taken from the seam where the upper tube is attached to the valve body to the inside of the tank top. <br /> i <br /> 20 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.