My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Title: 76-Fuel Tanks <br /> Discipline:Structural <br /> CULLUMBER ENGINEERING <br /> Project No.: CN1117 Originator: C.Dilworth/A.Foster Date: 4/16/2019 <br /> omponent:I Buoyancy Calculations Checked:1W.Cullumber Date: 4/16/2019 <br /> BuoVancV Equation <br /> Fb= p*g*V <br /> Fuel(p)= 60 Ib/ft3 *varies by fuel type <br /> g= 32.2 ft/sect <br /> V1(tank#1)= 20,000 gallons <br /> Conversion= 0.13368 V2(tank#2&3)= 20,000 gallons <br /> V1(tank#1)= 2,674 ft3 V2(tank#2&3)= 2,674 ft3 <br /> Tank#1 self weight= 11,300 Ib Tank#2/3 self weight= 12,700 Ib <br /> *Tank 1 weight governs for buoyancy analysis <br /> Uplift Buoyancy Forces <br /> Fb1= 5,165,434 Ibft/sect Fb2&3= 5,165,434 Ibft/sect <br /> Conversion= 0.03108 Conversion= 0.03108 <br /> Fbl= 160,547 Ibf Fb2&3= 160,547 Ibf <br /> Tank#1 Calculation: <br /> Self-weight of Concrete(Curb and Slab) Surcharge Weight of Soil <br /> Concrete Density= 150 Ib/ft3 Trib.Width= 10 ft <br /> Length= 37.73 ft <br /> Width= 1.5 ft Depth= 4.3 ft <br /> Length= 38.0 ft <br /> Curb Depth= 1.5 ft <br /> Volume= 85.5 ft3 <br /> Weight= 12,825 Ib Volume= 1622.35417 ft3 <br /> Density= 115 Ib/ft^3 <br /> Thick= 0.67 ft Soil Weight= 186,571 Ib <br /> Surface Width= 10 ft <br /> Slab Length= 37.73 ft <br /> Volume= 251.5 ft3 <br /> Weight= 37,729 Ib <br /> Total Weight= 261,250 Ib <---Downward <br /> vs. <br /> 160,547 Ib <---Uplift <br /> FS= 1.63 >1.5:.O.K. Tank#1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.