My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)-- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) 3. <br /> BUSINESS SITE ADDRESS 103, CITY 104. <br /> II.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634 2638,2641 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHERS eci fq� 490-3a <br /> ( P •7)� 490-3b <br /> III.MONITORING LOCATIONS <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 104)490-4 <br /> 490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 490-6 <br /> PANEL MANUFACTURER: _ _ _ _ 490.7 MODEL#: _ 490.8 <br /> LEAK SENSOR MANUFACTURER: 490-9. MODEL#(S): 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-I5 <br /> LEAK TEST FREQUENCY: .CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> _❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> PROGRAMMED TESTS: ❑ a.0.1g Ph. 490-18❑ b.0.2 g.Ph. c.OTHER(S ecify): <br /> 490-19 <br /> 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> `{Z[ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: E] a.36 HOURS El b.60 HOURS a 0-22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHERS eci 490-24 <br /> Q (Specify): 490-25 <br /> ❑99.OTHER (Specify): 490-26 <br /> ago-z7 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> ISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:❑a.DRY ❑b.LIQUID FILLED [1c.PRESSURIZED ❑d.UNDER VACUUM 490-29 <br /> _PANEL MANUFACTURER: _ 49130 MODEL#: 490-31 <br /> LEAK SENSOR MANUFACTURER 490-32 MODEL#(S): 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES ❑b.NO 490-34 <br /> FAILUREMISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 490-36 <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38 <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ELLD MANUFACTURER(S) 490-d0' MODEL#(S): 49041 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49044 <br /> QL 4.PIPE INTEGRITY TESTING 490-45 <br /> TEST FREQUENCY a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46 490-47 <br /> 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ] C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> *Allowed for monitoring of unburied emergency enerator fuel piping only per HSC§25281.5(b)(3 <br /> 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)]. 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 1 <br /> ❑ 99.OTHER(Specify) 490-52 <br /> 490-53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.