My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br /> This manual contains installation procedures for tlic Veeder-Root Overfill Alarm and Acknowledgement(Ack)Switch. <br /> The Overfill Alarm unit contains: <br /> • Red flashing light <br /> • Alarm horn <br /> The Acknowledgement Switch unit contains: <br /> • ACKNOWLEGED light <br /> • RESET push button <br /> • TEST push button <br /> Compatible Consoles <br /> • TLS-3XX/4XX Series <br /> • TLS-1R <br /> • TLS-50 <br /> • TLS-I-ff,D <br /> • TLS2 <br /> Related Manuals <br /> Depending on your installed console,you should reference the appropriate manuals below,to connect/setup the Overfill <br /> Alarm: <br /> 576013-879 TLS-3XX Series Site Prep Manual 576013-623 TLS-3XX Series Setup manual <br /> 577013-608 11S-50 Site Prep manual 577013-609 TT.S-50 Setup manual <br /> 577013-756 CLS2 Site Prep manual 577013-757 TLS2 Setup manual <br /> 577013-719 I l.S-TR Site Prep manual 577013-785 TLS-1 TLD Setup manual <br /> 577013-784 I'LS-T TT.D Site Prep manua 577013-879 TT,S-4XX Site Prep Manual <br /> Contractor Certification Requirements <br /> Veeder-Root requires the following minimum training certifications for contractors who will install and setup the <br /> equipment discussed in this manual: <br /> Level 1 Contractors holding valid Level 1 Certification are approved to perform wiring and conduit rOniting. <br /> equipment mounting,probe and sensor installation,tank and line preparation,and line leak detector <br /> installation. <br /> Level 2/3 Contractors holding valid Level 2 or 3 Certifications are approved to perforin installation checkout, <br /> startup,programming and operations training,troubleshooting and servicing for all Veeder-Root Tank <br /> Monitoring Systems,including Tine Teak Detection and associated accessories. <br /> Warranty Registrations may only he submitted by selected Distributors. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.