My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Overfill Alarm/Ack Switch Installation Guide Mounting Instructions <br /> 3"(76.2 mm) 0.313"(8 mm)dia. 2"(50.8 mm) TEST button <br /> 4 holes (on side) <br /> ACKNOWLEDGE <br /> Hinge O <br /> side <br /> 1/2" <br /> conduit RESET 6.75" <br /> connector � (171.5 mm) <br /> T <br /> 1.4" <br /> (35.6 mm) <br /> FUI1 <br /> 2"(50.8 mm) <br /> 1"(25.4 mm) .� <br /> —o4es\ack—evs 4.3"(109.5 mm) <br /> Figure 2.Acknowledgement Switch mounting dimensions <br /> Mounting Instructions <br /> OVERFILL ALARM <br /> 1. Select a mounting location where the Overfill Alarm can be seen and heard clearly from the area where the fuel tanks <br /> are filled In addition,consider the ease of routing interconnection conduit. <br /> 2. Locate and mark mounting holes using the hole pattern in Figure 1. <br /> 3. Mount the Overfill Alarm using the four mounting tabs on the housing. <br /> ACKNOWLEDGEMENT SWITCH <br /> 1. Select a mounting location where the Acknowledgement Switch can be easily activated by the tank truck driver.In <br /> addition,consider the ease of routing interconnection conduit. <br /> 2. Locate and mark mounting holes using the hole pattern in Figure 2. <br /> 3. Mount the Acknowledgement Switch using the fow-mounting tabs on the housing. <br /> 4. Install conduit between the Acknowledgement Switch,Overfill Alarm,and TLS Console. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.