Laserfiche WebLink
Overfill Alarm/Ack Switch Installation Guide Mounting Instructions <br /> 3"(76.2 mm) 0.313"(8 mm)dia. 2"(50.8 mm) TEST button <br /> 4 holes (on side) <br /> ACKNOWLEDGE <br /> Hinge O <br /> side <br /> 1/2" <br /> conduit RESET 6.75" <br /> connector � (171.5 mm) <br /> T <br /> 1.4" <br /> (35.6 mm) <br /> FUI1 <br /> 2"(50.8 mm) <br /> 1"(25.4 mm) .� <br /> —o4es\ack—evs 4.3"(109.5 mm) <br /> Figure 2.Acknowledgement Switch mounting dimensions <br /> Mounting Instructions <br /> OVERFILL ALARM <br /> 1. Select a mounting location where the Overfill Alarm can be seen and heard clearly from the area where the fuel tanks <br /> are filled In addition,consider the ease of routing interconnection conduit. <br /> 2. Locate and mark mounting holes using the hole pattern in Figure 1. <br /> 3. Mount the Overfill Alarm using the four mounting tabs on the housing. <br /> ACKNOWLEDGEMENT SWITCH <br /> 1. Select a mounting location where the Acknowledgement Switch can be easily activated by the tank truck driver.In <br /> addition,consider the ease of routing interconnection conduit. <br /> 2. Locate and mark mounting holes using the hole pattern in Figure 2. <br /> 3. Mount the Acknowledgement Switch using the fow-mounting tabs on the housing. <br /> 4. Install conduit between the Acknowledgement Switch,Overfill Alarm,and TLS Console. <br /> 4 <br />