My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:47:39 AM
Creation date
9/8/2020 2:12:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
76 FUEL ISLAND & CARWASH
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
03
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES CORNERS REF6-66.1NOTE: PM <br /> 6' CANOPY 8' TANKSLAB FOR REINFORCING AT TANK <br /> SLAB SLAB PENETRATIONS AND i ALL CONSTRUCTION SHALL MEET COUNTY (� <br /> STANDARDS. CONTRACTOR TO SECURE ENTIRE D� I � G N <br /> � �'f <br /> CONSTRUCTION AREA WITH CHAIN LINK <br /> FENCING DURING CONSTRUCTION PERIOD. - <br /> -�' - - -' - - - - - - - - - - - - - - - - ', Architectural <br /> 2 THE CONTRACTOR SHALL IMMEDIATELY NOTIFYACTUAL FIELD CONDITIONS AND THE PLANS <br /> r -_- - - - - _._ - - ,.- - - - - - - __ l I ENGINEER OF ANY DIFFERENCES BETWEEN THE Solutions Group <br /> BEFORE PROCEEDING WITH CONSTRUCTION. 6930 DESTINY DRIVE <br /> 1 I I SURE 100 <br /> F] <br /> 3 FUEL CONTRACTOR SHALL BE RESPONSIBLE ROCKLIN, CA 95677 <br /> I II I I <br /> FOR THE INTEGRITY OF THE PIPING SYSTEM <br /> DURI I I I <br /> I I I I I FLAITWORKN INSTALLATION, AND CONCRETE VW 6754 <br /> t +,5 <br /> ,Petro@pmdphq<an <br /> I I7 PUL 4 AFTER COMPLETING INSTALLATION OF aoiw. e.eo. aww <br /> O F I I I I I - DISPENSERS, THE FUEL CONTRACTOR IS TO <br /> INSTALL BRIGHT ORANGE CONSTRUCTION <br /> > > ) I I RUL FENCE AROUND ENTIRE DISPENSER. So ARCyIt <br /> g i i I 01 THE DAY THE GASOLINE SYSTEM IS PUT INTO <br /> I I i 5 FUEL CONTRACTOR IS TO BE AWARE THAT ON 1P <br /> FC}. <br /> y o O Q• <br /> GILBARCO AUTHORIZED SERVICE CONTRACTOR <br /> m I I I I i SERVICE, THE FUEL CONTRACTOR ANDA _ 4 <br /> p > > I I I qt MUST BE ON SITE ONE (1) HOUR PRIOR TO REN. 1/31/21 <br /> STARTUP AND MUST REMAIN ON SITE THREE (3) <br /> O I I I I I ADDITIONAL HOURS FOR A TOTAL OF FOUR (4) <br /> iv m m I I a ' I I DSL HOURS. ANY COSTS INCURRED OVER FOUR (4) JFOFCpL1FO� <br /> „ z HOURS DUE TO FUELING SYSTEM ISSUES, <br /> z 3-63.DI I I 1 SHOULD BE BILLED AS A CHANGE ORDER, <br /> F+ Fv I O REFERTOEQUIPMENT SCHEDULE, <br /> SHEET G7.0 8 G7.1 <br /> I I <br /> ® KEY NOTES <br /> LI IJ I � <br /> I I I D 6' CONCRETE SLAB AT FUELING CANOPY. <br /> L - - - - - - - _ REF 1-GOA AND CIVIL DRAWINGS FOR TOS <br /> L - - - - - -- - ai - - - - - - - - -I ELEVATIONS. <br /> GEON <br /> Q2 PAST EACH SIDE <br /> CMATEING TRE CH ND 17 <br /> TA <br /> PAST EACH SIDE OF PIPING TRENCH AND TANK <br /> (MIN BOUNDARY BTM OF EXCAVATION) EXCAVATION. <br /> 3Y-Y <br /> (MIN BOUNDARY TOP OF EXCAVATION) ❑3 MAPIPINGER THAT <br /> THE <br /> TRANC HE DUG IN SEQUA <br /> 36'-Y O.T.O. TANK SLAB CANOPY TYPICAL ® AT LEAS THATTHEDTH OF WIDTHN EQUAL TO <br /> REF SHEET A AND Q AT LEAST TWICE WIDTH OF ALL PIPING <br /> CANOPY MFR DRAWINGS 4 <br /> _ CONTAINED WITHIN. MAINTAIN A MINIMUM OF 4' <br /> (10em) CLEAR DISTANCE BETWEEN PIPING <br /> POSITIONED IN THE TRENCH AND S WHERE Z Z <br /> O REF 7-35.0 REF 1-65.0 PIPING CROSSES OVER EACH OTHER. THE O O <br /> BOTTOM OF THE TRENCH SHALL BE AS O `¢ <br /> TANK_ SLAB PLAN ❑ I ON UNIFORM AS POSSIBLE TO ELIMINATE HIGH w U w U U <br /> 2 SPOTS AND ENSURING AN EVEN LAYER OF w <br /> LL <br /> "ttO _ BEDDING MATERIAL UNDER THE PIPE. ❑ O O O <br /> O S <br /> 3 <br /> ALL SHARP ROCKS AND DEBRIS FROM THE V V 3 U V <br /> - u �o TRENCH BOTTOM BEFORE BEDDING MATERIAL o b L) x❑ <br /> 2 ❑ qO • ❑ IS INSTALLED. 0 <br /> 16 1 3G7 .0 <br /> SPACING ® SITE CONDITIONS MAY CAUSE VARIATIONS w <br /> WHICH MUST BE APPROVED BY 76 FUELING AND <br /> DISPENSER STATION FLOWRATER. PIPING BURIAL DEPTHS <br /> 112" LETS <br /> MIN ID TYPICAL ` - _ _ - _ - _ THAN 18' REQUIRES 76 FUELING APPROVAL <br /> TYPICAL 3 1 2 SPACING -_ W I 1.6 NOZZLES - 10 GPM ❑ o m <br /> 3 44 OVER 3' DBL-WALL <br /> ❑ t 8 NOZZLES - 9.5 GPM �c <br /> q _ • q FIBERGLASS MAIN TRUNK w <br /> I 3-31 .0 < © a <br /> LINE VAPOR PIPING - 10 NOZZLES - 8.8 GPM <br /> • • � SLOPE 7/B" PER FOOT MIN TEE IS SET AT � I � <br /> z - 45' ANGLE, 1)!P I 12 NOZZLES - 8.3 GPM <br /> O - <br /> PFA GRAVEL R <br /> � ,y ( (OR APPROVED <br /> M-ALTERNATENATE) <br /> 3-G1A <br /> -Y-, SPACING TANK t2 FILL/VAPOR SUMP (PUL) <br /> REF 4-36.1 AND 1-GLIA <br /> Z - 3Gi.D (p'Il�IOS LT Flo <br /> SPACING tl� - � o <br /> � D I wV I TANK 82 STP SUMP (PUL) O <br /> REF 4-G8.1 AND 7-G4.0 <br /> - 17 361 .0 INTERSTITIAL MONITOR <br /> m E REF 5-G6.1 AND 4-G3.0 <br /> REF 1-35.0 Q REF 1-G5.0 I <br /> 12d MIN tY MIN tY MIN TYP I TANK SI FILL/VAPOR SUMP (RUL) <br /> DIMENSK)NS INCLUDECROSSWER REF 6.0 I REF 4-GS-1 AND 1G4.1 H <br /> 30 <br /> (4 PIPE) 48' WIDE TRENCH © I - - - - VENT PI ING - SLOPEF 7 <br /> 3' X7 REDUCER YOVERYDBL-WALL I REMOTE PIPING DOWN FROM L <br /> FIBERGLASS PRODUCT REMOTE VENT DOWN TO TANKS <br /> BUSHING (6 LOC) I _ <br /> (3 PIPE) 36' Vr10E TRENCH AND VAPOR PIPING - p 1/0' PER FOOT MIN (n <br /> REFS-G5.0 SLOPE i <br /> (2 PIPE) 26' W7DE TRENCH <br /> 30 OVER Y DBL-WALL IMO PER FOOT MIN I $ II �I� <br /> FIBERGLASS / / (9 ' I i II ¢ CL Z 3 <br /> 16' LMDE TRENCH VAPOR PIPING - SLOPE I/8' SRI A AND CLEAN O 0 Q <br /> (1 PIPE) PER FOOT MIN, TRANSITION 3' SEPARATOR <br /> TO 4' OVER AT TRUNK LINE I �- .� W� Q ♦ ♦ N <br /> / TANKi3 TANK i, L9 0 1 n J / Z <br /> O n 110 FT DIA 10 FT DIA �y O G8.0 � „ � <br /> PIPING TRENCH SECTION 9 ' ° ' �. . ``' `_ <br /> ^- \ SPACING SPACING 172'000 GAL p'� REMOTE <br /> / \ y� ❑ [} =� I DIESEL REGULAR W J <br /> O u ❑ © c ., ❑ I REF 2-63.0 UNLEADED VENT Q Q <br /> 1•=1'-0• 70 1 I I REF i-33.0 •vim--� t�j i W W V <br /> 17 <br /> r- -. - 1 { � <br /> REF 1-G5.0 REF 1-G 0 <br /> 1 .O � LE L (� 0 <br /> I Fm <br /> 3' OVER Y DBL WALL FIBERGLASS CHASE `7w <br /> PIPING BETWEEN TANK SUMPS TYPICAL <br /> REF 1-G12.1 F j4< <br /> V <br /> TANK 03 DIESEL FILL SUMP <br /> REF 4-GSA AND 2G4.1 <br /> rr TANK #1 STt P SUMP (A L) •� i Project N=ber <br /> D I-G4 <br /> C�) DNP17002, 2 <br /> TANK 03 STP SUMP (DIESEL) -"- + <br /> REF 4-G6.1 AND 2-34.0 • ,q.-.moi `ate <br /> Lp� Sheet Name <br /> INTERSTITIAL MONITOR i .r- ^- ..-,. <br /> ' REF 5-36-1 AND 4-33.0 " / FUELING <br /> PIPING DESIGN BASED ON 25' LENGTHS PIPINGAND <br /> DESIGNER NOTE: TANK PLAN <br /> Cut <br /> THE CANOPY DRAINS SHALL NOT CONFLICT WITH <br /> EZ FUEL PIPING STANDARDS, CIVIL ENGINEER SHALL <br /> a COORDINATE WITH THE FUEL ENGINEER. <br /> FUEL PIPING PLAN Sheet Number <br /> G1 . 0 <br /> R! 11 CA <br />
The URL can be used to link to this page
Your browser does not support the video tag.