Laserfiche WebLink
pa �Sjl <br /> a . + <br /> UNLEADED <br /> REG. r a • DESIGN <br /> " UNLEADED FILL SUMP, I� <br /> ED <br /> TURBINE SUMP d VAC. I � <br /> O � " a PPNG,TNNU64R - - ' " " 5--� � + w Oo ' 4 - - - - - Architectural <br /> " Solutions Group <br /> 693D DESTINY DRIVE <br /> SUITE 100 <br /> ROCKUN, CA 95677 <br /> rpetroePrMp,rswn <br /> Oe ZONEB - oQ <br /> RUL d PUL VENT I Rq W. Petro. NCNetl <br /> PIPING, VENTSU P <br /> ZONES , 2 d 3 INCLUDE ALL REGULAR UNLEADED Z EI - RE( y0�5ED ARCy7l <br /> 97 <br /> PRODUCT, PIPING AND TANK SUMPS, ALL VAPOR uh .EADEDI R j <br /> RECOVERY PIPING, ALL UDC'S PLUS VACUUM ZONES 0AL 5 8 6INCLUDE ALL PREMIUM UNLEADED <br /> TUBING CHASE PIPE BETWEEN SUMPS ON PRODUCT PIPING, ALL REGULAR AND PREMIUM <br /> REGULAR UNLEADED TANK I UNLEADED VENT PIPING, REMOTE VENT SUMP,ALL t REN. 1/31/21 <br /> 00 <br /> O PREMIUM UNLEADED TANK SUMPS, PLUS VACUUM O <br /> TUBING CHASE PIPE BETWEEN SUMPS ON 001 <br /> VAPOR RECOVERY PREMIUM UNLEADED TANK qr <br /> LINE ANNULAR AND FpfCAltFO <br /> ALL UDC SUMPS <br /> o o ZONE 5 - PULTURBINE o <br /> ® SUMP, FILL SUMP d <br /> �i,i ZONE 4 - VAC. PIPING ANNULAR <br /> o o i PREMIUM UNLEADED - <br /> PIPING <br /> ZONE 1 - I I I <br /> ZONES - <br /> REG.-UNLEADED i <br /> VAPOR RECOVERY PIPING I I <br /> UNE ANNULAR AND <br /> ALL UDC SUMPS I al <br /> S ' <br /> 2 U : s <br /> U 3 V u <br /> VACUUM ZONES #1 , 2 & 3 VACUUM ZONES # 4 , 5 & 6 — PREMIUM s diz <br /> a o m <br /> VACUUM ZONE VOLUME CALCULATIONS <br /> ZONE 1 : REGULAR UNLEADED PRODUCT PIPING <br /> 3" DIA, OUTER PIPE OVER 2" INNER PIPE AT 209.2' = 6.7 CF ,. " <br /> e " <br /> ZONE 2: REGULAR UNLEADED TURBINE SUMP (0.268 CF), FILL SUMP (0.268 CF), AND VACUUM CHASE ANNULAR " a - • " O V " <br /> 3" DIA, OUTER PIPE OVER 2" INNER PIPE AT 17.2' = .4 CF; TOTAL ZONE 2 = 0.936 CF " <br /> ZONE 3: VAPOR LINE ANNULAR AND ALL UDC SUMPS (6 X 0.3015 CF = 1 .809 CF) ZONEzo <br /> 3" DIA, OUTER PIPE OVER 2" INNER PIPE AT 19' = .5 CF; TOTAL ZONE 3 = 2.31 CF DIESELLVENT PIPING <br /> ZONE 4: PREMIUM UNLEADED PRODUCT PIPING <br /> 3" DIA. OUTER PIPE OVER 2" INNER PIPE AT 212' = 6.8 CF Q O O <br /> ZONE 5: PREMIUM UNLEADED TURBINE SUMP (0.268 CF) , FILL SUMP (0.268 CF), AND VACUUM CHASE ANNULAR I ZONE 8 - DIESEL. <br /> 3" DIA, OUTER PIPE OVER 2" INNER PIPE AT 6' = .2 CF; TOTAL ZONE 6 = 0.736 CF TURBINE SUMP, FI Z <br /> ZONES 77, 86. 9 INCLUDE ALL DIESEL PRODUCT SUMP b VAC. PIPIP <br /> ANK SUMPS, PLUS <br /> ZONE 6: REGULAR UNLEADED AND PREMIUM UNLEADED VENT PIPE AND REMOTE VENT SUMP (0.3015 CF) AND VENT PIPING, DIESEL TANNULARVACUUM TUBING CHASE PIPE BETWEEN SUMPS ON U) <br /> 3" DIA. OUTER PIPE OVER 2" INNER PIPE AT 45.5' = 1 .24 CF; TOTAL ZONE 6 = 1 .54 CF DIESELTANK _ Q <br /> ZONE 7: DIESEL PRODUCT PIPING O 0 Z 3 <br /> 3" DIA, OUTER PIPE OVER 2" INNER PIPE AT 84.8' = 2.3 CF O O U <br /> Cq <br /> ZONE 8: DIESEL TURBINE SUMP (0.268 CF), FILL SUMP (0.268 CF), AND VACUUM CHASE ANNULAR > P 0 <br /> 3" DIA, OUTER PIPE OVER 2" INNER PIPE AT 7.5' = .2 CF; TOTAL ZONE 8 = 0.736 CIFo _ gr —o W J ZQ U <br /> ZONE 9: DIESEL VENT PIPING — — o Q w LLJ LU <br /> 3" DIA, OUTER PIPE OVER 2" INNER PIPE AT 42.3' = 1 .2 CF LL <br /> ZONE 7 - _ <br /> D DIESEL PIPING <br /> Q _ ^ O <br /> I <br /> a <br /> Project th+aber <br /> DNP17002. 2 <br /> Sheel Name <br /> no <br /> VACUUM ZONE PLAN <br /> VACUUM ZONES # 7 , 8 8c 9 DIESEL <br /> d A <br />