Laserfiche WebLink
06 / 28 / 2019 19 : 29 8387674 EMILS PAGE 05 <br /> Page of <br /> SWRCB . January 2002 <br /> 5. SECONDARY PIPE Tp:ISTING <br /> Test Method Developed By . X Piping Manufacturer L'• industry Standard :! Professional Engineer <br /> n Other (Specify) <br /> Test Method Used: X Pressure U Vacuum I- Hydrostatic <br /> C] Other (Spec) <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Rcsoiution : 1 /10- 15 Psi <br /> OWN <br /> Piping Run #1 )Piping Run #2 Piping Run 03 Piping Run # <br /> Piping Material ; Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> 3 , <br /> Piping Diameter: 3 3„ <br /> " <br /> 111 ' <br /> Length of Piping Run: Approx . 45 ' Approx. 50a Approx- 3 <br /> Product Stored: Regular 87 Super 91 Diesel <br /> Mcthod and tooation of ']rest boot at STP Test boot at STP Test boot at STP <br /> i in -run isolation: Pi in Sum # I Pi in Sump 42 Pi in Sum #3 <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes <br /> ressure and starting test: <br /> Test Start Time : 8 : 30 E&35 8 : 40 <br /> Initial Reading (RI) : 3 Psi i 3 Psi <br /> Test End Time: 9 :30 9 :35 9 :40 <br /> Final Reading (RF) : 3 Psi 3 Psi 3 Psi <br /> Test Duration : 1, Hour 1 Hour 1 Hour <br /> Change iNo n Reading (RF-Ri) : 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or . <br /> .—� No Loss in Psi No loss in Psi N <br /> Loss In Psi <br /> Criteria : � .. <br /> ads .`. ;i , • •;: : <br /> :. .: . : , : :• • . .Pass : <br /> IP <br /> ColMments (include information on repairs made prior to 1es[in , and recommendedallow-u forfalled tests) <br /> i <br /> Received Time Jun , 28 , 2019 7127PM No . 5223 <br />