My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
1405
>
2300 - Underground Storage Tank Program
>
PR0231485
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 11:15:13 AM
Creation date
9/8/2020 2:19:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231485
PE
2361
FACILITY_ID
FA0000306
FACILITY_NAME
EMILS LIQUOR & SPORTS SHOP*
STREET_NUMBER
1405
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
ESCALON
Zip
95320
APN
22707031
CURRENT_STATUS
01
SITE_LOCATION
1405 CALIFORNIA ST
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06 / 28 / 2019 19 : 29 8587674 EMILS PAGE 12 <br /> D. Results of Testingl8ervicing <br /> ' <br /> software Version Inaloiled: <br /> 14401 <br /> Com tete the followin checkitst: <br /> 0 Yes ❑ No' is tho audible AM operational? <br /> Yes d No' Is the visual alarm operatlonat 7 <br /> Ing <br /> Yes Cl No' Were all sensors visually inspected . functionally torted , aeonla containment and poconsitioned <br /> so that other equipment will not interfere with their proper <br /> ® <br /> Yes [� Now were all sensors installed at lowest pant of secondary <br /> operation? <br /> ❑ Yes ❑ Not If alarms are relayed to a remote monitoring station, is all communications equipment (e,g•, modem) operational? <br /> NIA in seconds containment monilodng system detects a leak, <br /> erste, or is systems, <br /> -telly disoonnecicd? H yes: which sensors initiate poshive shut-down? (Chea an that apply) ® Sump/Trarwh <br /> Yea ❑ No• For pressunYed piping systems, does the turbine autom�cally =htrt down if the piping <br /> electri <br /> ❑ NIA fails to op <br /> Sensors; ❑ Dispenser Containment Sensor+'• <br /> Dict you confirm positive shot•down due to leaks and sensor failuretdtsconnection? ® Y��e� III ❑ Nie. , no machanlcel overfill prevention valve is <br /> ❑ Yes ❑ No' For tank systems that utilize the monitoring system as the primary NINE tank ove�ll warning device ( en If so et what percent of lank canoatY <br /> NIA installed), is the overfill weming slerm visible and audible at the tank fill point(s) and operI prop Y' <br /> does the alarm trigger? robes , or other equipment replaced and list the mantrfacturer name <br /> ® yea ❑ No Wes any monitoring equipment repiacsd? tf yes, identity spec sensors, p <br /> and model for ail replacement parts in Section E . below. <br /> ❑Yes' ® No Was liquid found inside any secondary eomeinment sYmems designed as dry sY�ema? (Check all that apply) <br /> ❑ Product ; ❑ Water. if MEMO OEM MINIM <br /> yea, describe cAuses in Section Q . below. <br /> Yes ❑ No' <br /> was monitoring system setup reviewed to ensure proper settings? Ahadt set up reports. If applicable <br /> ® Yes ❑ No is air monitori1 11 <br /> ng equipment o erational per rnanufadure(s speCAWOons? <br /> In Section E below. describe how and when these deflcieneles were or will be corrected. <br /> Comments: REPLACED BAD 420 ANNULAR SENSOR . <br /> 2121 /07 <br /> page z of a <br /> Monitoring 5ysteht Certification <br /> Received Time Jun , 28 . 2019 7127PM No , 5223 <br />
The URL can be used to link to this page
Your browser does not support the video tag.