Laserfiche WebLink
06 / 28 / 2019 19 : 29 8387674 EMILS PAGE 23 <br /> UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM Page 5 of 6 <br /> XII . LINE LEAK DETECTOR TESTING <br /> ❑ Check this box if line leak defectors (LLD) are NOT Installed . (Do not complete this section.) y N NA <br /> This section must be completed if LLUS are Installed <br /> Was a leak simulated to verify LLD performance? Q El El <br /> (Check ail that apply.) Simulated leak rate verified : ❑X 3 OPH ❑ 0. 11 GPH <br /> E] 0.2 GPH <br /> Was the testing apparatus properly calibrated ? X ❑ ❑ <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leek is detected ? ❑ ❑ <br /> For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? N ❑ ❑ <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected ? El <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system fa disabled or disconnected ? ❑ � X <br /> For electronic LL.Ds , does the turbine automatically shut off if any portion of the monitoring system malfunctions or falls a test? ❑ El X <br /> For electronic LLDs, have all accessible wiring connections been vllsually inspected for kinks and breaks? ( ❑ X❑ <br /> Wen: all items on the equipment manufacturer's maintenance checklist completed? rz <br /> Were all LL Ds confirmed operational within regulatory requiremonls? JN ❑ ❑ <br /> For any answer of "N" above, describe in Sectlon Xlll how and when these issvea were or will be corrected_ <br /> X111 . COMMENTS <br /> XIV. VACUUM / PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> ❑X Check this box if VPH monitoring Is NOT used . (Po not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak defection monitoring. <br /> System Type (Mark all that apply.) ❑ Vacuum ElPressure ❑ Hydrostatic <br /> Component(5) Monitored B This sensor Sensor Functionality Interstitial Communication <br /> Sensor ID y Test Test <br /> ❑ Pass ❑ Fail ❑ Pass Fail <br /> �r ❑ Pass ❑ Feil ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass _ ❑ Fail <br /> ❑ Pass ❑ Fail Pass ❑ Fail <br /> ❑ Pass ❑ Fall Pass ❑ Fail <br /> ❑ Pass Fail ❑ Pass OEM <br /> Pass ❑ Fail Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fall ❑ Pass ❑ Fail <br /> ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pess Faii ❑ pass ❑ Fail <br /> How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br /> Other (Describe the method in section XV below. Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces ? Ellos ❑ No (Describe the reason in section XV below. <br /> For any answer of "f=ail" above, describe in Sectlon XV how And when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH = Gallons Per Hour, Y = Yes, N = No, NA = Not Applicable, VPH = VacvumiPcsssurelHydrostatic, ID = Identification <br /> Received Time Jun , 28 . 2019 1 : 27PM No , 5223 <br />