My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
625
>
2300 - Underground Storage Tank Program
>
PR0544955
>
REMOVAL_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 1:04:52 PM
Creation date
9/9/2020 9:57:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2019
RECORD_ID
PR0544955
PE
2361
FACILITY_ID
FA0025563
FACILITY_NAME
DBL RENTALS
STREET_NUMBER
625
Direction
N
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
625 N SACRAMENTO ST
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> COUNTY <br /> BACKFILL EXCAVATION CERTIFICATE <br /> Project Location : 619 and 625 South Sacremento Street <br /> Owner DBL Rentals - John Bubica Phone No : 209 - 625 - 5261 <br /> Contractor : Valued Engineering Phone No : 209 - 4774500 <br /> License No : 745200 <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1 . Submission of Soil Engineer' s Compaction Report within 30 days of project <br /> completion , or <br /> x 2 . Submission of verification , e . g . , load ticket , within 30 days of project completion <br /> that one of the following materials was placed in the excavation in 12 ' lifts : <br /> A . Pea gravel - -smooth , rounded material not more than one - half ( 1 /2 ) <br /> inch in diameter <br /> x B . Crushed rock- -self-compacting material not more than three - <br /> quarters ( 3/4 ) inch in cross sectional measurement . ( Use of <br /> crushed rock will not be permitted for backfill if contact will be made <br /> between the backfill material and tanks/ pipes made of poly resin <br /> glass or similar materials . ) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer' s Compaction Report will be submitted within 30 <br /> days of project completion , or submission of verification that the select material <br /> described above will be placed at a minimum of five ( 5 ) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure <br /> compliance with the Uniform Building Code Appendix Chapter 70 . <br /> * Name Robert Marty <br /> (Print) <br /> Title President <br /> Tri <br /> Signature <br /> * Shall be the responsible managing employee on the license or authorized agent . <br /> 10 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.