My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 4:34:08 AM
Creation date
9/9/2020 4:27:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEI/RP1200 - 12 <br /> f <br /> 5. If the spill bucket is found to have cracks , loose , ° <br /> parts or separation of the bucket from the fill b? ti <br /> � <br /> pipe, it is not considered to be liquid-tight. This <br /> visually indicates a test failure . ; C `l <br /> NOTE: If the fill cap is not included in the <br /> spill bucket test and/or the cap is not tight, it N `,o1R('t) 6\ Vok j UAL $ � <br /> could be the source of potential fuel contami- =- a ' �e <br /> nation from water intrusion. <br /> NOTE: Before permanently plugging, ensure <br /> that local regulations allow the drain valve to <br /> be permanently plugged. <br /> 6. 2. 5 Test Procedure . <br /> 1. Add water to the spill bucket to a level within <br /> 1 . 5 inches of the top of the spill bucket . Allow <br /> the water to settle for 5 minutes before the initial <br /> water level measurement is taken . <br /> 2 . Place the measuring stick vertically at the lowest <br /> point in the spill bucket and extending above the <br /> water level to allow for an accurate measure- <br /> ment to be taken . The location of the measuring <br /> stick must remain the same for each water level <br /> measurement. Document the initial water level <br /> measurement as measured from the bottom of <br /> the spill bucket. Alternative measurement meth- <br /> ods may be used provided that measurement to <br /> 1 / 16 (0. 063) inch can be made. <br /> 3. Take all precautions to prevent the water level <br /> from being disturbed during the duration of the <br /> test. <br /> 4. After 1 hour, document the ending water level <br /> measurement. <br /> 5. Upon completion of the test, remove and dis- <br /> pose of the water according to Section 6.7, and <br /> dry the inside of the spill bucket before returning <br /> it to service. <br /> 6. 2. 6 Pass/Fall Criteria. If the water level has <br /> dropped less than 1 /8 (0. 125 ) inch, the spill bucket <br /> passes the integrity test . <br /> If the water level has dropped 1 /8 (0. 125) inch or <br /> greater, the spill bucket fails the integrity test . <br /> pei .org <br />
The URL can be used to link to this page
Your browser does not support the video tag.