My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TULLY
>
19555
>
2900 - Site Mitigation Program
>
PR0521333
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 4:13:32 AM
Creation date
9/9/2020 4:46:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0521333
PE
2950
FACILITY_ID
FA0014501
FACILITY_NAME
D H WINN TRUCKING CO
STREET_NUMBER
19555
Direction
N
STREET_NAME
TULLY
STREET_TYPE
RD
City
LOCKEFORD
Zip
95237
APN
01902036
CURRENT_STATUS
01
SITE_LOCATION
19555 N TULLY RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> Department of Toxic Substances Control <br /> h�1'r f <br /> Ed��,w,,in'F. Lowry,�[�i� c�tor <br /> Mnston H. Hickox GlenVale,WIIirltii V Gray Davis <br /> Agency Secretary Governor <br /> :,alifornia Environmental <br /> Protection Agency <br /> March 13, 2003 <br /> Mr. Scott Rice <br /> URS Corporation <br /> 2870 Gateway Oaks Drive <br /> Sacramento, California 95833 <br /> APPROVAL OF PRELIMINARY ENDANGERMENT ASSESSMENT WORKPLAN, <br /> PROPOSED LOCKEFORD ELEMENTARY SCHOOL EXPANSION, 19555 NORTH <br /> TULLY ROAD, LOCKEFORD (SITE CODE 104292-27) <br /> Dear Mr. Rice: <br /> The Department of Toxic Substances Control (DTSC) has reviewed the Preliminary <br /> Endangerment Assessment (PEA) Workplan prepared by URS Corporation, dated <br /> January 31, 2003 and received February 10, 2003 for the subject site. The PEA <br /> Workplan includes site background information and a field sampling plan for the <br /> proposed investigation activities. <br /> On February 19, 2003, additional information was requested regarding the proposed <br /> soil gas sample collection and procedures, and the soil sampling analytical methods. <br /> These issues were clarified in an Addendum to the PEA Workplan (Addendum) <br /> submitted by URS Corporation., dated February 28, 2003. <br /> Based on the information provided, DTSC hereby approves the PEA Workplan and the <br /> Addendum. The Lodi Unified School District should provide a notice to residents in the <br /> immediate area, approved in form by DTSC, prior to start of field investigation activities. <br /> PEA fieldwork is scheduled to begin on Tuesday, March 18, 2003. Please notify DTSC <br /> a minimum of 48 hours in advance of schedule changes. <br /> The energy challenge facing California is real. Every Californian needs to take immediate action to reduce energy consumption. <br /> For a list of simple ways you can reduce demand and cut your energy costs,see our Web-site at www.dtsc.ca.gov. <br /> ® Printed on Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.