My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1973
>
2900 - Site Mitigation Program
>
PR0545766
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:58:34 AM
Creation date
9/9/2020 4:53:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545766
PE
2965
FACILITY_ID
FA0015802
FACILITY_NAME
JESSIES GROVE WINERY
STREET_NUMBER
1973
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95242
APN
01305017
CURRENT_STATUS
02
SITE_LOCATION
1973 W TURNER RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PKOGRAM NO. '4' <br /> SPENKER RANCH,INC. <br /> JESSIE'S GROVE WINERY <br /> SAN JOAQUIN COUNTY <br /> sample are readily discernible. The data shall be summarized in such a manner to clearly illustrate <br /> compliance with waste discharge requirements and spatial or temporal trends, as applicable. The results <br /> of any monitoring done more frequently than required at the locations specified in the Monitoring and <br /> Reporting Program shall be reported in the next scheduled monitoring report. <br /> As required by the California Business and Professions Code Sections 6735, 7835, and 7835.1, all <br /> groundwater monitoring reports shall be prepared under the direct supervision of a registered professional <br /> engineer or geologist and signed by the registered professional. <br /> A. Monthly Monitoring Reports <br /> Monthly reports shall be submitted to the Regional Board by the I" day of the second month <br /> following the end of the reporting period (i.e. the January monthly report is due by 1 March). <br /> Monthly reports for the months of March, June, September, and December may be submitted as <br /> part of the Quarterly Monitoring Report, if desired. The monthly reports shall include the <br /> following: <br /> 1. Results of influent, wetland, effluent, land application area, and solids monitoring; <br /> 2. A comparison of monitoring data to the discharge specifications and an explanation of any violation <br /> of those requirements. Data shall be presented in tabular format; <br /> 3. If requested by staff, copies of laboratory analytical report(s); <br /> 4. A calibration log verifying calibration of all hand held monitoring instruments and devices <br /> used to comply with the prescribed monitoring program; <br /> 5. The cumulative volume of wastewater generated during the year to date; <br /> 6. The total pounds of total dissolved solids (year to date) that have been applied to the land <br /> application area, as calculated from the sum of monthly loadings; and <br /> 7. The total pounds of nitrogen (year to date, from all sources including fertilizer) applied to the <br /> land application area as calculated from the sum of monthly loadings. <br /> B. Quarterly Report <br /> Beginning with the fourth quarter 2004, the Discharger shall establish a quarterly sampling <br /> schedule for groundwater monitoring such that samples are obtained approximately every three <br /> months. Quarterly monitoring reports shall be submitted to the Regional Board by the 1St day of <br /> the second month after the quarter (i.e. the January-March quarter is due by May 1") each year. <br /> The Quarterly Report shall include the following: <br /> 1. Results of groundwater monitoring; <br /> 2. A narrative description of all preparatory,monitoring, sampling, and analytical testing <br /> activities for the groundwater monitoring. The narrative shall be sufficiently detailed to verify <br /> compliance with the WDR, this MRP, and the Standard Provisions and Reporting <br /> Requirements. The narrative shall be supported by field logs for each well documenting depth <br />
The URL can be used to link to this page
Your browser does not support the video tag.