Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page s of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed. 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection), 3) devices monitoring tank <br /> annularspaces orvault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring ventpiping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring ventltransition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> UST Monitoring Site Plan <br /> Site Address: 8115 S EL DORADO ST STOCKTON , CA <br /> S -FLDORaDO STREET <br /> STORE . <br /> . p meP L` . 7. � <br /> CF) o P c . . . . . . . . . . . . <br /> . . . . . . . .87. . . . . . . _ . _ . - . . . . . . . <br /> M *PIPLNG * . 3 <br /> A Drawing ofpiping m <br /> T exit of sump and . . . . . _ <br /> Ii UDC's. No <br /> E <br /> 5 underground <br /> draping is - _ . <br /> R gg, , nz - . . . . . . . . . . . . . . . OS <br /> O cannot speculate - . . . . . . . . . _ . . _ <br /> A blue prints. . . . . I . . <br /> D . _ . . - - S <br /> 0 <br /> G <br /> KEY OFFICE <br /> . - - A = ?Ni M-tX Sensor <br /> . - . . . . . . F = FILLS <br /> TO 1 - 5. . . . . _ - I* = VAPOR <br /> mI . . . . . . . P = PROBE <br /> L = Turbine / Leak Detector <br /> . _ I . . . . Y = SUNIPSFNSOR /�, �} C.UMOIi <br /> • - B = Brine Sensor CANISTER <br /> S = Smart Sensor <br /> C = FioaLt & Chains Co P.\'. VENTS <br /> . . . . . . . . . . E = E Stop . . . . . <br /> clap items underground that are not visible to the certi$•iug teclmiciau are a <br /> professional opinion only and are solely for infemtational purposes. Draniug not to <br /> scale. <br /> Date map was drawn: 5122119 <br /> Instructions <br /> If you already have a diagram that shows all required information. you may include it, rather than this page, with your Monitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps- , dispenser pans, spill wntainers, or other secondary containment areas; mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br />