My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:14 PM
Creation date
9/10/2020 10:04:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
nucleus pump services <br /> 601 1st Ave , Suite B <br /> Sacramento , CA 95818 <br /> Phone : 916 - 3824761 <br /> Fax : 707 - 638 -0484 <br /> ]E . ® . VR203 /204 <br /> Veeder- Root Vapor Polisher ® perabil1 est dorm <br /> Permit Number: Test Company : Nucleus Pump Services <br /> Site Name : CHEVRON Technician : Chris Bishop <br /> Site Address : 10878 N , HWY 99 Certification Number Expiration Date <br /> city : STOCKTON zip : 95212 District: 8216429 5/4/2020 <br /> Date/Time of Test: 10/2/2019 10 : 00 AM VST : 3000965405 8/9/2020 <br /> Veeder-Root: B36744 5/6/2021 <br /> TEST INFORMATION <br /> Calibration date for digital manometer (must be within 6 months of the test) 9 - 15 - 2019 <br /> Ending value for digital manometer drift test (must be 0 . 01 in . w. c . or less) 0 . 00 <br /> Calibration date for thermometer (must be with 6 months of the test) <br /> Vapor polisher valve close date and time (must have been closed for at least 2 hours) <br /> Atmospheric pressure sensor serial number <br /> PRESSURE INTEGRITY TEST <br /> Nitrogen gas flow rate (scfli) 18 SCFH <br /> Starting pressure (in. w.c .) & 01 " <br /> Final pressure at 1 minute (in . w. c . ) 8 . 03 " <br /> Is the final pressure > 7 . 0 in. w.c .? Yes <br /> Is the difference between the starting and final pressure < 0 . 5 in . w. c . ? Yes <br /> NOTES : ' If the final pressure is not > 7 . 0 in . w. c. and the difference is not < 0. 5 in . w. c. , then the vapor polisher is not in <br /> compliance. <br /> FLOW TEST <br /> Nitrogen gas flow rate (scfh) 18 SCF H <br /> Pressure (in. w. c .) 2009 " <br /> Is the pressure between 1 . 69 and 2 .25 in . w. c . ? Yes <br /> NOTES : 'The flow rate must be 18 . 0 t 0.2 scfh. <br /> 'The pressure must be between 1 . 69 and 2.25 in. w. c. or the vapor polisher is not in compliance. <br /> 'Three-way valve must be returned to normal (open) operating position after testing is completed. <br /> QPMC valve mode must be re-set to automatic after testing is completed. <br /> I declare, under penalty of perjury under the lcros of the state of California that based on information and belief formed <br /> after reasonable inquiry, the statements and information provided in this document are trace, accurate, and complete. <br /> Signature of Technician : � T/'�.,>` Date : 10/2/2019 <br /> Ver. 1 . 2 — 08 . 07 . 09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.