Laserfiche WebLink
nucleus pump services <br /> nps 601 1st Ave, Suite B <br /> Sacramento , CA 95818 <br /> Phone : 916 - 3824761 <br /> Fax: 707- 638 - 0484 <br /> TP � 201 . 4 <br /> Dynamic Back Pressure 'Fest Report Foran <br /> Permit Number: Test Company : Nucleus Pump Services <br /> Site Name : CHEVRON Technician: Chris Bishop <br /> Site Address : 10878 N , HWY 99 Certification Number Expiration Date <br /> City : STOCKTON zip : 95212 District: 8216429 5/4/2020 <br /> Date/Time of Test: 10/2/2019 10 : 00 AM <br /> TEST INFORMATION <br /> Phase II vapor recovery system executive order (as referenced on Permit to Operate) <br /> Pressure measuring device X digital manometer ❑ mechanical gauge <br /> Calibration date for pressure measuring device (must be within 90 days of the test) 9 - 15 -2019 <br /> Ending value for digital manometer drift test if applicable (must be 0 .01 in. w.c . or less) 0 . 00 <br /> Back pressure test assembly leak check (must decay < 0 . 2 in . w.c . in 5 min . at 50% of the scale of the <br /> assembly ' s highest range) <br /> BACK PRESSURE LIMITS (in . w . c.) BY EXECUTIVE ORDER FOR PRE-PHASE II EVR <br /> SYSTEMS <br /> G-70-52 (balance for AST & UST) & G-70- 139 (Hirt VCS-200 ) 0 . 15 @ 20 CFH 0 .45 @ 60 CFH 0 . 95 @ 100 CFH <br /> G-70- 177 & 181 (Hirt VCS400 ) 0 . 50 @ 60 CFH <br /> G-70- 191 (Healy ORVR) 0 . 50 @ 60 CFH <br /> BACK PRESSURE LIMITS (in . w. c.) BY EXECUTIVE ORDER FOR PHASE II EVR SYSTEMS <br /> VR-201 & 202 (Healy Phase I1 EVR) 0 . 50 @ 60 CFH <br /> VR-203 (VST balance Phase 11 EVR) 0 .35 @ 60 CFH 0 . 62 @ 80 CFH <br /> Nozzle <br /> Number Fuel Grade 20 CFH 60 CFH 80 CFH 100 CFH <br /> 1 MPD 32 . 46 <br /> 2 MPD . 32 . 48 <br /> 3 MPD . 34 . 52 <br /> 4 MPD . 34 . 55 <br /> 5 MPD . 34 . 52 <br /> 6 MPD . 32 . 55 <br /> 7 MPD . 30 . 48 <br /> 8 MPD . 30 . 44 <br /> I declare, under penalty of perjury under the lari�s of the state of California that based on information and belief formed <br /> after reasonable inquity, the statements and information provided in this document are true, accurate, and complete. <br /> Signature of Technician : /�jl Date : 10/2/2019 <br /> Ver. 1 . 3 — 08 . 07 . 09 <br />