Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (page a of ti) <br /> Vlll. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, El El <br /> tested, and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with El ❑ <br /> their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? © ❑ <br /> Was the monitoring panel's backup battery visually inspected, functionally tested, and conflrmed operational? © ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑ ❑ <br /> FRI <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or Is electrically <br /> disconnected ? ❑ ❑X ❑ <br /> Does the turbine automatically shut down? the piping secondary containment monitoring system detects a leak? ❑ ❑ ❑ <br /> Which sensors initiate positive shut down . (Check all that apply.) 0Sump XUnder-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) operational? Q ❑ ❑ <br /> For any answer of "N" above, describe in Section 1X how and when these deficiencies were or will be corrected <br /> IX. COMMENTS <br /> EMERGENCY GEN NO SHUTDOWN <br /> X. IWTANK GAUGING TESTING <br /> FXCheck this box if tank gauging is used only for inventory control. (Do not complete this secilon.) <br /> [:] Check this box if NO tank gauging equipment is installed. (Do not complete this section.) Y N NA <br /> This section must be coat feted if in-tank gaugingis used to perform leak detection monitoring, <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for <br /> round faults? ❑ ❑ ❑ <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally <br /> tested , and confirmed operational? ❑ ❑ ❑ <br /> Was accuracy of system's product level readings tested? ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled property? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? n I ❑ ❑ <br /> For any answer of "N" above, describe in Section Xl how and when these deficiencies were or will be corrected. <br /> XL COMMENTS <br /> P - _ f <br /> =Mill <br /> CNV1 R0N11Y3 [ , id ] Ai <br /> Y = Yes, N = No, NA = Not Apples* <br />