Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed ? YES N NO [ I <br /> acturer <br /> ng <br /> icates for each <br /> 2 . Submit copies of ICC Service component thatan ris repaired ed orrrieplaced . Encate and lsurenafcopy of the `ISite Health and Safety <br /> person installing or testing any comp <br /> Plan" is available on the jobsite as required by Title 8 . <br /> ents and attach a diagram <br /> wn <br /> 3 . Detailed description of work to bairn and/or List com sonIf repair ng abe pcomponent ,idescred or dribe how this will be done, (If <br /> to scale showing location of rep rade , use the UST Installation Application <br /> addingpiping , UDC ' s , or other UST equipment , or performing tank top upgrade , <br /> pages 4 -8 as necessary for a timely plan review) : <br /> Replace diesel Drop Tube . <br /> facturer' s specification sheets showing third -party approval) : <br /> 4 . List of equipment to be used (Attach manu <br /> OPW 71 SO <br /> EH230038 (revised 7-26-2016) 3 <br />