My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
13975
>
2300 - Underground Storage Tank Program
>
PR0231622
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
9/10/2020 10:40:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231622
PE
2351
FACILITY_ID
FA0000055
FACILITY_NAME
TESORO (SPEEDWAY) #68150
STREET_NUMBER
13975
Direction
E
STREET_NAME
STATE ROUTE 88
City
LOCKEFORD
Zip
95237
APN
01908014
CURRENT_STATUS
01
SITE_LOCATION
13975 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed ? YES N NO [ I <br /> acturer <br /> ng <br /> icates for each <br /> 2 . Submit copies of ICC Service component thatan ris repaired ed orrrieplaced . Encate and lsurenafcopy of the `ISite Health and Safety <br /> person installing or testing any comp <br /> Plan" is available on the jobsite as required by Title 8 . <br /> ents and attach a diagram <br /> wn <br /> 3 . Detailed description of work to bairn and/or List com sonIf repair ng abe pcomponent ,idescred or dribe how this will be done, (If <br /> to scale showing location of rep rade , use the UST Installation Application <br /> addingpiping , UDC ' s , or other UST equipment , or performing tank top upgrade , <br /> pages 4 -8 as necessary for a timely plan review) : <br /> Replace diesel Drop Tube . <br /> facturer' s specification sheets showing third -party approval) : <br /> 4 . List of equipment to be used (Attach manu <br /> OPW 71 SO <br /> EH230038 (revised 7-26-2016) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.