Laserfiche WebLink
ECONOMIC BENEFIT REALIZED BY NOT PERFORMING MONITORING <br /> MOKELUMNE RIM VINEYARDS <br /> SAN JOAQUIN COUNTY <br /> Quarterly Monitoring Report Cost Estimate <br /> Well Sampling and Report Preparation <br /> Labor Cost per Unit Unit Cost Cost <br /> Sample Collection 45 10 450 <br /> Disposable Equipment 100 2 200 <br /> Report Preparation 85 8 680 <br /> 1330 Subtotal <br /> Groundwater Monitoring (see annual cost below for additional cost for annual sample event) <br /> Analyte/Parameter Cost per Unit Unit Cost Cost <br /> NO3 9 1 9 <br /> TKN 10 1 10 <br /> TDS 8 1 8 <br /> 27 Subtotal <br /> 1357 Total Quarterly GW Monitoring Event <br /> Groundwater Monitoring Annual Cost(once a year sample event) <br /> Analyte/Parameter Cost per Unit Unit Cost Cost <br /> Boron 6 1 6 <br /> calcium 6 1 6 <br /> iron 6 1 6 <br /> magnesium 6 1 6 <br /> potassium 6 1 6 <br /> sodium 6 1 6 <br /> chloride 9 1 9 <br /> 45 Subtotal <br /> 1402 Total Annual GW Monitoring Event <br />