My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VAN ALLEN
>
17327
>
2900 - Site Mitigation Program
>
PR0523609
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 11:49:19 AM
Creation date
9/10/2020 11:42:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523609
PE
2950
FACILITY_ID
FA0015938
FACILITY_NAME
MATHIAS PROPERTY
STREET_NUMBER
17327
Direction
S
STREET_NAME
VAN ALLEN
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
20508025
CURRENT_STATUS
01
SITE_LOCATION
17327 S VAN ALLEN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associates Inc. <br /> Quality Assurance/Quality Control Plan <br /> Revised November 2002 <br /> All withdrawn groundwater will be stored on-site in 55-gallon waste drums unless permission is <br /> granted by the appropriate regulatory agency to discharge the water to the ground surface or <br /> sanitary sewer. Drummed water will be labeled with the source of the water to help ensure <br /> appropriate disposal based on contamination levels. <br /> 11.0 SOIL SAMPLING PROTOCOL <br /> 11.1 Sample Collection During Drilling Activities <br /> A proposal will be submitted to the lead regulatory authority with proposed <br /> boring/sampling locations. The exact location and number of borings at each site will be <br /> determined in the field by the Project Geologist/Engineer. <br /> Prior to arriving at the sample site, the drill rig/augers will be steam cleaned and all <br /> sample equipment will be cleaned. Cleaning will be conducted on-site on all sampling <br /> equipment between each sample interval. <br /> For hollow-stem auger drilling methods, soil samples will be obtained using a California <br /> modified split-spoon sampler containing three 6-inch long, 2-inch diameter brass tubes. <br /> The sampler will be driven 18-inches ahead of the hollow stem auger by a 140-pound <br /> hammer with a 30-inch drop in accordance with American Society for Testing and <br /> Materials (ASTM) Methods D 1586-84 for split barrel sampling of soil and D 1587-83 <br /> for thin-walled tube sampling of soils. The blows required to drive the sampler each 6- <br /> inch interval will be recorded on the boring log. The sampler will be removed from the <br /> boring and opened to reveal the brass tubes. The bottom tube will be sealed with <br /> w:\admin\shells\qaqc-02.doc <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.