My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 11:45:11 AM
Creation date
9/10/2020 1:39:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
JACKSONS ENERGY #6822
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 1 <br /> Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities <br /> ing requirements stated in this recommended practice are <br /> general statements and may vary. Recommended pies - 6 . SPILL BUCKET AND <br /> sure levels and test durations are Addressed in Section 5 .7 , CONTAINMENT SUMP <br /> Piping manufacturers ' test procedures niay differ. TESTING <br /> This test can be conducted in sections or as one con- <br /> tinuous pipe depending on dhe installation . Fare should he 6. 1 General . Spill buckets and containment sumps for <br /> taken to ensure that the entire seeondary containment of tank systems are neither intended nor designed for the <br /> the piping system is tested, storage of petroleum products, but rather to contain small <br /> 5.6 Test Equipment . Test equipment shall include: leaks and spills for short periods of time. This section <br /> describes the procedures used to test the integrity of shill <br /> • inert gas source (nitrogen, helium, etc .) ; buckets and containment sumps to ensure that they do not <br /> • stopwatch or other time -measurement device capable leak , <br /> of measuring act I -second increment ; 6 . 2 Spill Bucket Integrity Testing — Hydrostatic <br /> • test tubing assemblies (Tubing Assemblies provide Test Method . <br /> access to the beginning and end of the interstitial ___ _ __ _ <br /> space . ) ; WARNING : Do not use fuels such as gaso- <br /> • pressure gauge with a 15 prig maximum pressure read- line , E85 or diesel as a test fluid because <br /> Ing with U.5 increments . they present a serious fire and safety <br /> hazard . Gasoline vapors are flammable <br /> 5. 7 Test Procedure . and can explode If exposed to an ignition <br /> 1. If necessary, re-install termination ( test) boots at pip- source such as a spark or open flame . If <br /> ing terminations . a tank or containment area Is not tight, <br /> using fuel as the test fluid will cause a <br /> 2. If necessary, connect the tubing assemblies to the see- release into the soil or groundwater. <br /> ondary containment termination fitting on each end of <br /> the section of piping to be tested . <br /> 3 . Connect the inert gas source and pressure gauge. <br /> 4. Gradually pressurize the interstitial space to 5 psib . <br /> Close the valve and allow the pressure to stabilize. <br /> Repressurize to the specified test pressure if necessary. Water Level <br /> 5. observe the pressure for a period of I hour. <br /> 6 * if the piping pressure after I hour is less than the test — -- <br /> pressure, check termination fittings and test assemblies _ <br /> for leaks . <br /> 7. Release the pressure on the system slowly, <br /> S. Remove the test equipment . <br /> 9. Restore the piping to its normal operating condition . <br /> 5.8 Pass/ Fail Criteria . if no pressure change occurs <br /> during the test period . the piping system passes the sec- <br /> ondary containment integrity test. FiGURE 61. The iiydrostatic method of determining <br /> spill bucket integrity uses water to detect teaks. The <br /> If there is any drop in pressure over the test period, the measuring stick must be placed in the same location <br /> piping fails the secondary containment integrity test . at the beginning and end of the test period to ensure <br /> if there is any, increase in pressure over the test period , accurate water level readings , <br /> repent the testt <br /> v <br /> pei . org <br />
The URL can be used to link to this page
Your browser does not support the video tag.