Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 4 of s) <br /> WI . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational ? © Q E <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, <br /> functionaliv tested , and confirmed operational ? 0 El El <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with Q <br /> their proper operation ? <br /> El El <br /> Was monitoring system set-up reviewed to ensure proper settings? (� <br /> Was the monitoring panel's backup battery visually inspected , functionally tested, and confirmed operational? ® ElF <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? © El _ 0 <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically <br /> disconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ❑ ❑ <br /> Which sensors initiate positive shut down ? (Check all that apply.) Z Sump [a Under-Dispenser Containment <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e .g . , modem) operational? <br /> For any answer of "N " above, describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> Replaced TLS Battery for PM Purpose , <br /> X. IWTANK GAUGING TESTING <br /> ❑ Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) Y N NA <br /> This section must be completed if in-tank gauIng is used to perform leak detection monitorin . <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for <br /> round faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally © El F1 <br /> tested , and confirmed operational? <br /> Was accuracy of system's product level readings tested ? 0 El n <br /> Was accuracy of system's water level readings tested ? [1 El El <br /> Were all probes reinstalled properly? Z El I El <br /> Were all items on the equipment manufacturer' s maintenance checklist completed? Q L1 I El <br /> E For any answer of "N" above, describe in Section Xl how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> i <br /> Y = Yes, N = No, NA = Not Applicable <br /> i <br /> i <br /> E <br />