Laserfiche WebLink
MW-03 <br /> 1 <br /> � I <br /> ---------- -WATER---------- <br /> --------------------------------II <br /> va------- <br /> � GAS-I--1C� <br /> 7- <br /> --------------------------------------- <br /> MW-04 I v I <br /> w I <br /> w SB 13 I MW-01 TW-01 -- -.. <br /> I � <br /> I <br /> t <br /> SB-011 ( SB-02 t <br /> ■ 1 I � <br /> G---------- ■ <br /> ---------------------- <br /> I I cn <br /> I Q <br /> I I <br /> I <br /> I I Z <br /> •SB-12 I Q <br /> SB-03 ~ <br /> 50,18 I I of <br /> 1 Lu <br /> j I Q <br /> - - - - - - - - - - - 1 - -WATER-------------- ------------ <br /> Z <br /> SB-04 O <br /> SB-ii SB-14 U <br /> 1 D <br /> 0 <br /> I I O <br /> � tr <br /> I SB-05 d <br /> •SB-10 <br /> SB-17 I 1 SE-1S <br /> 1 <br /> I <br /> I � <br /> SB-09 ■ ---------------------� <br /> ■ — — — --- <br /> SB-06 ------- <br /> SB-08 SB-07 MW-02 <br /> SB-16 <br /> -----ELECTRICAL--------------------------------------- <br /> -- -- -- ----------•ELECTRICAL------------------------ 0 10 20 <br /> Feet <br /> 0- <br /> GRAPHIC SCALE <br /> 0- <br /> 6 <br /> a LEGEND: PACIFIC GAS&ELECTRIC COMPANY <br /> Y o PROPOSED WELL O EXCAVATION(AUGUST 2010) MCDONALD ISLAND COMPRESSOR STATION.NEAR STOCKTON,CA <br /> oo r--j GROUNDWATER MONITORING WELL <br /> MONITORING WELL LEXCAVATION AREA(DECEMBER 2009) INSTALLATION AND SAMPLING WORK PLAN ADDENDUM <br /> (AUGUST 2011) CONCRETE PAD <br /> �c GRAB GROUNDWATER PREVIOUS SAMPLING <br /> SAMPLE LOCATION TEMPORARY FENCE <br /> �o • (AUGUST 2010) <br /> O ----UNDERGROUND ELECTRICAL LINE AND EXCAVATION LOCATIONS <br /> m <br /> Uo <br /> SOIL BORING(APRIL 2010) --- UNDERGROUND GAS LINE <br /> A.. ❑■ BOLLARD I FIGURE <br /> F'o -"-UNDERGROUND WATER LINE ARCADIS 3 <br /> LLa <br /> GAS VALVE <br /> tea` <br />