My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
1181
>
2900 - Site Mitigation Program
>
PR0535015
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 1:00:47 PM
Creation date
9/11/2020 12:43:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0535015
PE
2960
FACILITY_ID
FA0020252
FACILITY_NAME
PG&E MCDONALD IS COMPRESSOR STATION
STREET_NUMBER
1181
STREET_NAME
ZUCKERMAN
STREET_TYPE
RD
City
TRACY
Zip
95234
APN
12908052
CURRENT_STATUS
01
SITE_LOCATION
1181 ZUCKERMAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> Flecbic Company" <br /> Robert M.Gray 3401 Crow Canyon Rd. <br /> Remediation Project Manager San Ramon,CA 94583 <br /> Environmental Remediation <br /> (925)415-6355 <br /> (925)415-6852 <br /> RMGO@pge.com <br /> February 22, 2013 <br /> Kathy Amaru <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 11020 Sun Center Drive#200 <br /> Rancho Cordova, CA 95670-6114 <br /> Subject: Groundwater Monitoring Well Installation and Sampling Work Plan Addendum <br /> Pacific Gas and Electric Company McDonald Island Compressor Station <br /> Dear Ms. Amaru: <br /> Per your request, please find attached revised figures presenting proposed monitoring well <br /> locations for the Pacific Gas and Electric Company(PG&E) McDonald Island Compressor Station <br /> C-51 Tank Site located on Zuckerman Road near Holt, California. The proposed well installation <br /> and sampling activities are detailed in Groundwater Monitoring Well Installation and Sampling <br /> Work Plan that was submitted in November 2012. Please note that the proposed locations may <br /> be adjusted in the field due to obstructions or above/underground utilities. <br /> If you have any questions or concerns, please do not hesitate to contact me at 925-415-6355 or <br /> rmg0@pge.com. <br /> Sincerely, <br /> l <br /> 4 <br /> Robert M. Gray <br /> Remediation Project Manager <br /> Copies: <br /> Kathleen Abbott, ARCADIS <br /> Allison Greenly, ARCADIS <br />
The URL can be used to link to this page
Your browser does not support the video tag.