Laserfiche WebLink
Pacific Gas and <br /> Flecbic Company" <br /> Robert M.Gray 3401 Crow Canyon Rd. <br /> Remediation Project Manager San Ramon,CA 94583 <br /> Environmental Remediation <br /> (925)415-6355 <br /> (925)415-6852 <br /> RMGO@pge.com <br /> February 22, 2013 <br /> Kathy Amaru <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 11020 Sun Center Drive#200 <br /> Rancho Cordova, CA 95670-6114 <br /> Subject: Groundwater Monitoring Well Installation and Sampling Work Plan Addendum <br /> Pacific Gas and Electric Company McDonald Island Compressor Station <br /> Dear Ms. Amaru: <br /> Per your request, please find attached revised figures presenting proposed monitoring well <br /> locations for the Pacific Gas and Electric Company(PG&E) McDonald Island Compressor Station <br /> C-51 Tank Site located on Zuckerman Road near Holt, California. The proposed well installation <br /> and sampling activities are detailed in Groundwater Monitoring Well Installation and Sampling <br /> Work Plan that was submitted in November 2012. Please note that the proposed locations may <br /> be adjusted in the field due to obstructions or above/underground utilities. <br /> If you have any questions or concerns, please do not hesitate to contact me at 925-415-6355 or <br /> rmg0@pge.com. <br /> Sincerely, <br /> l <br /> 4 <br /> Robert M. Gray <br /> Remediation Project Manager <br /> Copies: <br /> Kathleen Abbott, ARCADIS <br /> Allison Greenly, ARCADIS <br />