Laserfiche WebLink
Groundwater Monitoring <br /> Well Installation and <br /> ARCADIS Sampling Work Plan <br /> PG&E McDonald Island <br /> Compressor Station <br /> 1. Introduction <br /> ARCADIS U.S., Inc. (ARCADIS)has prepared this work plan on behalf of Pacific Gas <br /> and Electric Company(PG&E)to propose the installation of groundwater monitoring <br /> wells and sampling activities at the McDonald Island Compressor Station(site),which <br /> is located approximately 8 miles southwest of Stockton, near Holt, California (Figure 1). <br /> The actual address for the site is 1181 Zuckerman Road,Tracy, California. The <br /> activities described in this work plan are being proposed based on discussions with the <br /> Regional Water Quality Control Board, Central Valley Region(Central Valley Water <br /> Board)on September 4,2012.The additional groundwater monitoring well installation <br /> and subsequent groundwater sampling will be completed to further evaluate <br /> groundwater quality at the site. <br /> Mcdonald Island Addtl MW Installation Work Plan Do- <br />