Laserfiche WebLink
ARCADIS Ms. Kathy Amaru <br /> May 26, 2011 <br /> Monitoring Well Installation <br /> To minimize the potential for encountering subsurface utilities, the well locationwill '�'� <br /> be cleared to a minimum depth of 5 feet bgs with a hand auger or air knife/vacuu <br /> truck equipment prior to drilling. Once cleared, the boring will be advanced using <br /> direct-push drilling equipment to an approximate total depth of 16 feet bgs by <br /> licensed drilling contractor. The exact depth of the well will be identified by the depth <br /> at which groundwater is encountered. The drill rig will be equipped with 4-foot <br /> acetate liners and continuous soil samples will be collected and logged for <br /> stratigraphic characteristics and field screened for the presence of volatile organic <br /> carbons (VOCs)using a photoionization detector(PID). <br /> Monitoring Well Construction <br /> Upon completion of the bore hole to approximately 4 feet below encountered <br /> groundwater(the expected depth to water at the site is approximately 12 feet bgs), a \\ <br /> pre-packed monitoring well constructed with 2-inch-diameter schedule 40 polyvinyl <br /> chloride(PVC)casing with 5 feet of screened interval of 0.010 inch slotted PVC at <br /> the base of the well will be placed in the borehole. The pre-packed monitoring will <br /> have No. 2/12 Monterey Sand packed around the screened interval and contained <br /> within stainless steel mesh. After the monitoring well has been placed in the <br /> borehole, the drilling rods will be pulled to one foot above the top of the sandpack to �� ! (� <br /> allow formation materials to collapse around the sandpack and riser pipe. This will <br /> create a barrier between the screened interval and the bentonite and grout used to <br /> seal the well. A hydrated bentonite slurry seal with a thickness of one foot will be <br /> placed above the sandpack. The remainder of the annular space will be grouted with <br /> neat cement to approximately 6 inches bgs. <br /> The well will be fitted with a locking well cap and completed with a traffic-rated <br /> 12-inch diameter flush-mounted well box that will be labeled as a monitoring well. <br /> Monitoring Well Development <br /> After a minimum of 72 hours following installation, the newly installed monitoring well <br /> will be developed using a combination of surging, bailing and pumping. A surge block <br /> will be moved up and down across the screened interval to remove fine-grained <br /> deposits from the formation near the monitoring well, boring wall, and from the filter <br /> material.After surging the monitoring well, a pump and/or bailer will be used to <br /> remove water containing suspended sediments from the casing. Additional purging <br /> Page: <br /> McD Island Well Install WoVan_Fina1.000 4/8 <br />