Laserfiche WebLink
ARCADIS Ms. Amaru <br /> June 1, 2010 <br /> • TPH as gasoline by USEPA Method 8015B (M) <br /> • TPH as diesel by USEPA Method 8015B (M) <br /> • TPH as motor oil by USEPA Method 8015B (M) <br /> • Moisture content by ASTM Method D-2216(so that results can be presented on a <br /> dry weight basis) <br /> With the exception of one sample, the results for all contingency samples were not <br /> detected above laboratory reporting limits or were detected at concentrations below <br /> screening levels (Table 1). One sample collected from boring C51-SB13 (from 5.5 to <br /> 6 feet bgs) contained a TPH as motor oil concentration of 190 mg/kg. <br /> Proposed Additional Soil Removal <br /> As described in the Site Sampling and Soil Removal Work Plan, ARCADIS proposes <br /> to expand the existing excavation and remove additional impacted soils based on the <br /> soil sampling results. The intent of the expanded excavation will be to focus on <br /> removing impacted soil in the directions of the borings containing concentrations <br /> above ESI-s. <br /> Figure 3 presents the proposed excavation areas. Prior to digging, the underground <br /> utilities in these areas will be positively identified using hand tools (e.g., shovels) or <br /> an air knife. Soil will then be removed if possible using a small backhoe or bobcat; <br /> however, the presence of structures, pipelines and/or conduits may limit the ability to <br /> remove additional soil. <br /> Soil around borings C51-SB2 and C51-SB13 will be excavated vertically to <br /> approximately 7 feet bgs (or approximately one foot below the impacted soil). Soil in <br /> this area will be excavated horizontally within the limits of the surrounding <br /> underground utilities. If the soil cannot be removed safely from this area, the <br /> excavation activities will be discontinued. <br /> Soil around boring C51-SB4 will be excavated vertically to approximately 10 feet bgs <br /> (or approximately two feet below the impacted soil). Soil in this area will be <br /> excavated horizontally within the limits of the surrounding borings and underground <br /> utilities. <br /> Page: <br /> 4/8 <br />