My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
1181
>
2900 - Site Mitigation Program
>
PR0535015
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 1:00:47 PM
Creation date
9/11/2020 12:43:49 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0535015
PE
2960
FACILITY_ID
FA0020252
FACILITY_NAME
PG&E MCDONALD IS COMPRESSOR STATION
STREET_NUMBER
1181
STREET_NAME
ZUCKERMAN
STREET_TYPE
RD
City
TRACY
Zip
95234
APN
12908052
CURRENT_STATUS
01
SITE_LOCATION
1181 ZUCKERMAN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Part 4: Program Fee Schedules 39 <br /> PER PER <br /> f <br /> $ ANNUM HOUR <br /> WELL SYSTEM PROGRAM FEES <br /> Domestic/Agricultural/Industrial Well System <br /> Well Construction Permit <br /> New/Replacement Repair................................................................ 341 ea <br /> Special............................................................................................. 368 ea <br /> Cross Connection Repair................................................................. 53 ea <br /> Pump Permit <br /> New/Repair/Replacement................................................................ 53 ea <br /> Well Destruction Permit <br /> Destruction during Replacement Well Inspection............................. 105 ea <br /> Test Well........................................................................:................ 125'(2 hr min) X <br /> 1 to 8 inch diameter well casing(separate inspection visit).............. 158 ea <br /> >8 inch diameter well casing(separate inspection visit)................... 263 ea <br /> Out-of-Service Well Permit........................................................................ 105 ea <br /> Public Well System <br /> I <br /> Well Construction Permit <br /> New/Replacement/Repair................................................................ 125'(4 hr min) X <br /> Pump Permit <br /> New/Repair/Replacement................................................................ 80 ea <br /> Well Destruction Permit <br /> Destruction during Replacement Well Inspection............................. 125'(1 hr min) X <br /> I to 8 inch <br /> ter well <br /> >8 inch diameter welcasii <br /> ng( (ng separate(separateinspection <br /> inspection ................... 125'(3 hr min) X <br /> Out-of-service Well Permit......................................................................... 105 ea <br /> Monitoring Well Installation and Destruction Permit Fee.......................... 125'(1 hr min) X <br /> Plus 1 hr for each additional well...............:............................................... 125' X <br /> InspectionslReinspections......................................................................... 125'(3 hr min) X <br /> Soil Boring Permit Fee................................................................................ 125'(1 hr min) X <br /> nn-spections/Re inspections. ..................................................................... 125'(3 hr min) X <br /> Mom0- -ring e I Repair Permit Fee............................................................. 125 (1 hr min) X <br /> Geophysical Well/Soil Boring Permit......................................................... 399 ea <br /> Inspection/Reinspection per parcel(after 3 his or for repeat visits)............ 1251(l hr min) X <br /> Cathodic Protection Well Permit................................................................. 263 ea <br /> OtherWell Permit......................................................................................... 341 ea <br /> Miscellaneous Fees <br /> Inspections/Reinspections.......................................... 125'(1 hr min) X <br /> Consultation.............................................................................................. 125'(1 hr min) X <br /> PlanCheck .....................................:............................................................ 125'(2 hr min) X <br /> Complaint inspection(wl violations)........................................................... 125'(1 hr min) X <br /> ABOVEGROUND PETROLEUM STORAGE ACT PROGRAM FEES <br /> APSA Facility—SPCC Exempt.................................................................... 0 <br /> APSA Facility 1,320 gal and<10,000 gal................................................... 0 <br /> APSA Facility 10,000 gal and<100,000 gal............................................... 675 X <br /> APSA Facility 100,000 gal and<1,000,000 gal........................................... 750 X <br /> APSA Facility 1,000,000 gal and<10,000,000 gal...................................... 850 X <br /> APSA Facility 10,000,000 gal and<100000,000 gal................................... 1,000 X <br /> APSA Facility?100,000,000 gal.................................................................. 1,150 X <br /> 'After regular office hours,on weekends and on holidays,an overtime hourly rate calculated at one and one half times this amount is charged. <br /> A minimum of three(3)hours at this overtime hourly rate will be charged for Call Back inspectionlresponse services. <br /> SJC Environmental Health Department Fee Schedule August 1, 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.