My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Z
>
ZEPHYR
>
1010
>
2900 - Site Mitigation Program
>
PR0537168
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2020 2:25:21 PM
Creation date
9/11/2020 12:59:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0537168
PE
2950
FACILITY_ID
FA0021337
FACILITY_NAME
AIR PRODUCTS & CHEMICALS (STKN CO-GEN)
STREET_NUMBER
1010
STREET_NAME
ZEPHYR
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17728013
CURRENT_STATUS
01
SITE_LOCATION
1010 ZEPHYR ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLE/NFELOER <br /> .�Bright People.Right Solutions. <br /> Groundwater samples will be collected with a decontaminated stainless steel bailer. <br /> 2.9 Geoprobe Closure <br /> Upon completion of Geoprobe sampling, the borings will be closed by backfilling the <br /> borings with a neat cement grout, or bentonite chips or powder. <br /> 2.10 Soil Boring Closure and Cutting Disposal <br /> Soil borings are closed immediately after the collection and logging of soil samples. <br /> Closure is accomplished by grouting the boring with a cement/bentonite slurry or as <br /> otherwise required. <br /> Drill cuttings will be placed in 55-gallon drums wrapped in plastic or spread around the <br /> boring and left on site for disposal by the site owner. If requested, Kleinfelder can <br /> coordinate disposal of soil and water after analytical results are available. <br /> 3 GROUNDWATER WELL INSTALLATION <br /> 3.1 Monitoring Well Construction <br /> Construction details for shallow groundwater monitoring wells are as follows: <br /> • The well casing are 2- or 4-inch inside diameter, flush threaded joint, <br /> schedule 40 PVC pipe. <br /> • The wells are constructed in 8- or 10-inch diameter borings. <br /> • Well screen sections are perforated with 0.010- or 0.020-inch factory-cut <br /> slots. <br /> • The wells are generally screened from 5 feet above to 15 feet below first <br /> groundwater. The screen length is reduced if an aquitard with a minimum <br /> thickness of 5 feet is encountered. If an apparent aquitard is encountered, <br /> the well is usually terminated 1 to 2 feet into the aquitard. Effort is made <br /> not to screen across two aquifers. If confined aquifer conditions or high <br /> vadose zone contamination are encountered, the well screen is usually <br /> not set above the depth of first encountered groundwater. Wells are <br /> usually not set in areas of suspected significant soil contamination. <br /> • The PVC pipe and end caps are steam cleaned prior to installation. <br /> • The annular space between the screen and the wall of the boring is <br /> backfilled with the appropriate clean sand to approximately 2 feet above <br /> the top of the perforated sections. Based on soil logs or a sieve test, <br /> modifications may be made regarding the size of sand to be used. <br /> 114050.WP/ST012P0580 Page iv of vii July 16, 2012 <br /> Copyright 2012 Kleinfelder <br />
The URL can be used to link to this page
Your browser does not support the video tag.