Laserfiche WebLink
SummerHill Apartment Communities 10391.000.000 <br /> Rollins Road-Carolan Avenue, Burlingame November 19, 2014, Revised January 14, 2015 <br /> protection, and high visibility vests. In the unlikely event significant unforeseen environmental <br /> conditions are discovered, work will stop and San Mateo County Environmental Health will be <br /> contacted. <br /> A primary and backup PID unit will be maintained onsite for the duration of fieldwork. Each unit <br /> will be fully charged and calibrated daily. <br /> Work activities will be conducted Monday through Friday between 7:00 AM and 6:00 PM. <br /> Excavation will be performed using a combination of scrapers, backhoes, track-mounted <br /> excavators and/or loaders. The contractor will adhere to OSHA guidelines. If excavations require <br /> shoring, it will be provided by the contractor. <br /> 8.2 SOIL EXCAVATION AND STOCKPILE MANAGEMENT <br /> The development will consist of a significant engineered cut of up to 6 to 9 feet below the ground <br /> surface in the northern portion of the Site for the construction of the underground parking. Prior to <br /> beginning the excavation,the soil in the planned excavation area will be characterized to determine <br /> the appropriate disposal options and to allow for excavation and off-haul without first stockpiling <br /> on site(Section 7.0) <br /> A PID will be used to screen soils during the excavation. Also, if soils exhibiting evidence of <br /> environmental impact (e.g., odor or staining) is identified at the proposed margins or bottom of <br /> the excavation, the excavation will be advanced to a greater depth and/or lateral dimension as <br /> appropriate until impacted soil exhibiting evidence of impact have been removed. <br /> Impacted soils, if encountered, will be stockpiled onsite. As appropriate and necessary, to <br /> prevent potential impact to underlying soils or surfaces, stockpiles will be placed on 10-mil <br /> plastic sheeting. The soil stockpiles will be covered with 10-mil plastic sheeting and secured to <br /> prevent dust or runoff during storm events. Appropriate dust control and stormwater best <br /> management practices (BMPs)will be implemented during the soil mitigation activities. <br /> The soil stockpiles will be profiled for landfill disposal in general accordance with the "CAL- <br /> EPA Department of Toxic Substances Control (DTSQ Information Advisory - Clean Imported <br /> Fill Material" document. The specific laboratory profile will be determined prior to excavation <br /> activities; however, it is anticipated as a minimum, the stockpile samples will be analyzed for <br /> Total Petroleum Hydrocarbons as diesel and motor oil with silica gel cleanup (EPA 8015) and <br /> CAM 17 metals (EPA 6010B). <br /> 8.3 CONFIRMATION SAMPLING <br /> Where impacted soils are encountered and removed, verification samples will be collected from <br /> the resulting excavations. Sample areas exhibiting target analytes (see list below) in excess of the <br /> corresponding screening levels will be excavated an additional 12 inches vertically and <br /> - 8- ENGEO <br /> --Expect Excellence— <br />