My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COSSY7D7G
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAMMERS
>
18972
>
2200 - Hazardous Waste Program
>
COSSY7D7G
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 4:17:38 PM
Creation date
9/14/2020 10:30:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
RECORD_ID
COSSY7D7G
PE
2200
STREET_NUMBER
18972
Direction
S
STREET_NAME
LAMMERS
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21202002
ENTERED_DATE
7/16/2018 12:00:00 AM
SITE_LOCATION
18972 S. LAMMERS ROAD, TRACY, CA 95304
RECEIVED_DATE
7/16/2018 12:00:00 AM
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SummerHill Apartment Communities 10391.000.000 <br /> Rollins Road-Carolan Avenue, Burlingame November 19,2014, Revised January 14,2015 <br /> protection, and high visibility vests. In the unlikely event significant unforeseen environmental <br /> conditions are discovered, work will stop and San Mateo County Environmental Health will be <br /> contacted. <br /> A primary and backup PID unit will be maintained onsite for the duration of fieldwork. Each unit <br /> will be fully charged and calibrated daily. <br /> Work activities will be conducted Monday through Friday between 7:00 AM and 6:00 PM. <br /> Excavation will be performed using a combination of scrapers, -backhoes, track-mounted <br /> excavators and/or loaders. The contractor will adhere to OSHA guidelines. If excavations require <br /> shoring, it will be provided by the contractor. <br /> 8.2 SOIL EXCAVATION AND STOCKPILE MANAGEMENT <br /> The development will consist of a significant engineered cut of up to 6 to 9 feet below the ground <br /> surface in the northern portion of the Site for the construction of the underground parking. Prior to <br /> beginning the excavation,the soil in the planned excavation area will be characterized to determine <br /> the appropriate disposal options and to allow for excavation and off-haul without first stockpiling <br /> on site(Section 7.0) <br /> A PID will be used to screen soils during the excavation. Also, if soils exhibiting evidence of <br /> environmental impact (e.g., odor or staining) is identified at the proposed margins or bottom of <br /> the excavation, the excavation will be advanced to a greater depth and/or lateral dimension as <br /> appropriate until impacted soil exhibiting evidence of impact have been removed. <br /> Impacted soils, if encountered, will be stockpiled onsite. As appropriate and necessary, to <br /> prevent potential impact to underlying soils or surfaces, stockpiles will be placed on 10-mil <br /> plastic sheeting. The soil stockpiles will be covered with 10-mil plastic sheeting and secured to <br /> prevent dust or runoff during storm events. Appropriate dust control and stormwater best <br /> management practices (BMPs)will be implemented during the soil mitigation activities. <br /> The soil stockpiles will be profiled for landfill disposal in general accordance with the "CAL- <br /> EPA Department of Toxic Substances Control (DTSQ Information Advisory - Clean Imported <br /> Fill Material" document. The specific laboratory profile will be determined prior to excavation <br /> activities; however, it is anticipated as a minimum, the stockpile samples will be analyzed for <br /> Total Petroleum Hydrocarbons as diesel and motor oil with silica gel cleanup (EPA 8015) and <br /> CAM 17 metals (EPA 6010B). <br /> 8.3 CONFIRMATION SAMPLING <br /> Where impacted soils are encountered and removed, verification samples will be collected from <br /> the resulting excavations. Sample areas exhibiting target analytes (see list below)in excess of the <br /> corresponding screening levels will be excavated an additional 12 inches vertically and <br /> -8- <br /> f , <br /> G <br /> EO <br /> +� <br /> -Expect Excellence— - <br />
The URL can be used to link to this page
Your browser does not support the video tag.