Laserfiche WebLink
5. Place the remaining ring over the sump entry fitting in the 10. Do not disturb assembly until the adhesive is cured.This <br /> inside of the sump and rotate to the desired angle. Make includes bonding of pipe to the sump entry fitting and <br /> alignment mark on both the sump wall and the ring when installing the threaded outlet fitting. See adhesive kit <br /> at the desired angle to make the"free"surface of the ring instructions for cure times. <br /> as close to perpendicular(square)to the axis of the fitting <br /> as possible. 11. The use of an industrial hot air gun may speed up the <br /> curing process. Do not overheat. <br /> 6. Mix one 8 oz. PSX-34 or one 8069 adhesive for each <br /> fitting per the instructions in the adhesive kit.Filler should 12. Remove 1/4 inch plastic threaded outlet protector. <br /> be used with 8069 to insure proper sealing of alignment Apply adhesive only to the 1/4 inch fitting and screw <br /> rings. into the 1/4 inch threaded outlet.Tighten to 40 in.-Ibs.or <br /> 11/2-2 turns past hand tight. <br /> 7. Apply adhesive generously,approximately 1/16 inch thick, <br /> to the inside and the outside of the sump walls where the NOTE: Over-tightening the tapered threads of the fitting <br /> alignment rings are located. Coat the edges of the hole may damage the fitting body. DO NOT OVER-TIGHTEN. <br /> cut in the sump wall.Apply a thin coating of adhesive to <br /> the bonding surfaces of the alignment rings. After installing the fitting, be sure the interstitial space is <br /> free from excess adhesive. Install a short hose and blow <br /> 8 Line up rings with alignment marks and press together excess adhesive through the air passage. <br /> firmly holding the fitting in place from the outside of the <br /> sump. NOTE: Verify with testing company or monitoring <br /> manufacturer if a larger thread is needed for their <br /> 9. Slide the metal retaining ring over the inside section of equipment. After the port fitting is installed, do not <br /> the sump entry fitting and against the inner alignment remove. <br /> ring until all the rings are tight against both sides of the <br /> sump wall. (A short section of 4 inch pipe may be used 13. Connect only flexible tubing or hoses to the port fitting. <br /> to drive the metal retaining ring over the fitting). Be sure <br /> there is an adhesive bead visible between the rings and NOTE:Tubing or hoses must be rated to full vacuum. <br /> the sump wall.The metal ring must hold the assembly in <br /> position while the adhesive cures. If the assembly is not Drawings below show the assembly of the fitting and <br /> tight against the sump wall,firmly press the sump entry associated pipe when using either size-over-size <br /> fitting against the outside sump wall while pressing the containment systems or coaxial pipe. <br /> metal ring against the alignment ring on the inside.Clean <br /> excess adhesive from all bonding surfaces. <br /> ADHESIVE <br /> BEAD <br /> T _ T T <br /> RETAINING RETAINING <br /> RING RING <br /> 2 <br />