My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
1420
>
2300 - Underground Storage Tank Program
>
PR0231736
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2020 11:56:09 AM
Creation date
9/14/2020 11:21:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231736
PE
2361
FACILITY_ID
FA0002562
FACILITY_NAME
Sutter Valley Hospitals dba Sutter Tracy Community Hospital
STREET_NUMBER
1420
Direction
N
STREET_NAME
TRACY
STREET_TYPE
Blvd
City
Tracy
Zip
95376
APN
233-081-01
CURRENT_STATUS
01
SITE_LOCATION
1420 N Tracy Blvd
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page a of 6) <br /> XIII . VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> A ❑ I B ❑ I C 1 D ❑ <br /> A ❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify) : <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Vapor Recovery Piping Containment Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> Interstitial Communication Verification Method Used : <br /> XIV. COMMENTS <br /> Provide any additional comments here. <br /> NA- Section III - No Vapor Recovery Piping Containment at this UST Facility . <br /> XV. TURBINE / PRODUCT PIPING SUMP TESTING INFORMATION <br /> Manufacturer I Identify Tank ID from Section III for each Manufacturer <br /> Unknown Coated Steel A ❑x B ❑ I C ❑ D ❑ <br /> A ❑ B I C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑x Engineered Method (Specify): Caldwell Systems/ Hydrostatic- 30 Minutes <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Turbine / Product Piping Sump Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> Caldwell Level Change Indication 7/5/2020 <br /> ICC Service Technician #5246802 - UT 3/21 /2021 <br /> Underground Storage Tank Tester License #90- 1120 1 12/31 /2019 <br /> XVI , COMMENTS <br /> Provide any additional comments here. <br /> ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.