My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 4:52:23 PM
Creation date
9/14/2020 11:36:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page s of <br />XVI. MONITORING SITE PLAN <br />Date site map was prepared: <br />If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br />Certification Form- The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br />if installed: 1) monitoring system control panels; 2) in -tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br />annular spaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring -vent p1pirf d ices <br />monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices montf rt �undr diener cratfinert 10) <br />line leak detectors; and 11) devices monitoring any other secondary containment areas.= �- .:.. <br />tAonitoring System Certification <br />• SAe_Address_. <br />=[_3'L - 1013 <br />UST Monitoring Site Plan <br />---------------- -•-------•---•--------- IF r g�(1•a�m t� <br />—Pacific Avenue Chevron IF, 6633 Pacific Ave Stockton CA 95207 � H ,% F i" <br />p; [:f,�J-f { j tFE ( <br />II IFF <br />- -:: <br />04 <br />I IF ��-l.. _ t ..,.. <br />{ itFor <br />'IF <br />- 3 l r j F <br />i- _"I, d 1 ,...� .. <br />�t s• <br />i tsil <br />a <br />I t (I t _ yrs` ,RECEIVED ! <br />f IFI II <br />pr — <br />F < Ins- <br />IF ?li �_._-j �� <br />{-4 111 <br />— <br />sI I FF — <br />IF r <br />I�F. <br />z <br />_._ <br />�'• <br />i 1 a-,, 1k _ .o- <br />S <br />b <br />€ tFIT <br />IF In 0 <br />- -_ _ .. . <br />--' - - <br />=- __ ._ <br />I ti IF <br />In <br />IF IF, <br />it i K .,..-,.. <br />t Pat 'Wwwal rem' .rte... <br />1 �WQ% 6'AP+IY 1 , <br />11 IF IF <br />ukwinn <br />r'. <br />f <br />I <br />_ <br />-sI . <br />t:;. mart <br />ukwinn <br />Date map eras drawn: tl2ga9 <br />Instructions <br />If you already have a diagram thatshows all required information, you may include 0. rather than the page, with your Monitoring System Certification. On your site plan, <br />shovrthe general layout of tanks and piping. Clearly identify locations of the following equ°pment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the data this Site Plan was prepared. <br />;C <br />Date map eras drawn: tl2ga9 <br />Instructions <br />If you already have a diagram thatshows all required information, you may include 0. rather than the page, with your Monitoring System Certification. On your site plan, <br />shovrthe general layout of tanks and piping. Clearly identify locations of the following equ°pment, if installed: monitoring system control panels; sensors monitoring tank <br />annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak detectors; and in -tank liquid level <br />probes (if used for leak detection). In the space provided, note the data this Site Plan was prepared. <br />
The URL can be used to link to this page
Your browser does not support the video tag.