My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2300 - Underground Storage Tank Program
>
PR0231784
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 4:52:23 PM
Creation date
9/14/2020 11:36:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231784
PE
2361
FACILITY_ID
FA0003834
FACILITY_NAME
PACIFIC AVE CHEVRON
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
097-410-48
CURRENT_STATUS
01
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />Y = Yes, N = No, NA Not <br />MONITORING SYSTEM CERTIFICATION FORM (Page a of 6) <br />VIII. MONITORING SYSTEM AND PROGRAMMING <br />This section must be completed if a monitoring panel is used to perform leak detection monitoring. <br />Y <br />N <br />NA <br />Are the visual and audible alarms operational? <br />X <br />El <br />EJ <br />Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, <br />❑X <br />❑ <br />❑ <br />functionally tested, and confirmed operational? <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br />0 <br />❑ <br />❑ <br />their proper operation? <br />Was monitoring system set-up reviewed to ensure proper settings? <br />❑X <br />❑ <br />❑ <br />Was the monitoring panel's backup battery visually inspected, functionally tested, and confirmed operational? <br />❑X <br />❑ <br />❑ <br />Does the flow of fuel stop at the dispenser if a leak is detected in the under -dispenser containment? <br />❑X <br />❑ <br />❑ <br />Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically <br />Z <br />❑ <br />❑ <br />disconnected? <br />Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br />❑ <br />ElIf <br />Which sensors initiate positive shut down? (Check all that apply.) ❑X Sump ❑X Under -Dispenser Containment <br />AD <br />alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) operational? <br />El❑X <br />For any answer of "N" above, describe in Section IX how and when these deficiencies were or will be corrected. <br />IX. COMMENTS <br />�r <br />�. <br />y <br />_ <br />❑ 1 <br />ENVI �IR0N <br />X. IN -TANK GAUGING TESTING <br />0 Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br />❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) <br />Y <br />N <br />NA <br />This section must be completed if in -tank gauging is used to perform leak detection monitoring. <br />Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for <br />❑ <br />❑ <br />❑ <br />round faults? <br />Were all inAank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally <br />❑ <br />❑ <br />❑ <br />tested, and confirmed operational? <br />Was accuracy of system's product level readings tested? <br />❑ <br />❑ <br />❑ <br />Was accuracy of system's water level readings tested? <br />❑ <br />❑ <br />❑ <br />Were all probes reinstalled properly? <br />❑ <br />❑ <br />❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ <br />❑ <br />❑ <br />For any answer of "N" above, describe in Section Xi how and when these deficiencies were or will be corrected. <br />XI. COMMENTS <br />Applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.