Laserfiche WebLink
I! <br /> ties are designed to withstand flooding and the maximum probable <br /> seismic event. <br /> The existing tanks are pumped an average of 2 times per month (4 <br /> loads per station each occasion) during the rainy season of <br /> December through March. After the new tanks are installed to col- <br /> lect the rain water run-off separately, it is estimated that <br /> pumping will still be required approximately 2 times per month. <br /> PG&E currently contracts with Gomes Excavation and Tank Service <br /> in Rio Vista to transport the waste water. Gomes delivers the <br /> water to Injection Systems in Woodland for disposal . Future con- <br /> tract transport will be by licensed haulers to an approved dis- <br /> posal facility. <br /> PGyE <br /> ERNIE RALSTON <br /> V.ND PUNNING ANALYST 1401 FULTON STREET <br /> U NO OEPARTMENT FRESNO CA 97760 <br /> SAN JOAOUIN VALLE•REGION 209.441 5497 <br /> mcdona1d. 100 MCIFIC GAS AND ELECTRIC COMPANY CO 621.1497 <br /> 11-23-87 <br /> I <br /> I <br /> i <br /> 1 <br />