Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM(Page i Qf i) <br /> Type of Action 5 Installation Inspection ❑Repair Inspection ❑36 Month Inspection <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Business Site Address City ZIP Code <br /> i UU i V ('7104 kd MI ''5-2 c� <br /> 11. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection(Print as shown on the ICC Certification.) Phone# <br /> VAV C t, k I1Clk1 d h l_CD91(041'1 �,� <br /> Contractor i Tank Tester License* ICC Certification# ICC Certification Expiration Date <br /> Overfill Prevention Equipment Inspection Training and Certifications(List applicable,certifications.) <br /> 0,,9 vt/ /vs-7-v /,4'W0/J /Vis/ .C-if- /5U7eG?6'/7vti <br /> III. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method 5ZManufacturer Guidelln, s(Specify): <br /> Used: e� r N - T- N Gr -/Zw C e /NS cr T7 Uri)S <br /> ❑Industry Code or Engineering Standard(Specify): <br /> ❑Engineered Method(Specify): <br /> Attach the inspection procedures and ail documentation required to determine the results. #of Attached Pages <br /> TANK ID:(By tank number, stored product, etc.) ©k E rj t-. (r <br /> What is the tank Inside diameter?(inches) Cr(,f I <br /> Is the fill piping secondarily contained? ❑Yes Z No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Is the vent piping secondarily contained? ❑Yes -No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Overfill Prevention Equipment Manufacturer(s) <br /> What is ft overfill prevention equipment response Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow <br /> when activated? Restricts Flow ❑Restricts Flow ❑Restricts Flow ❑Restricts Flow <br /> (Check all that apply.) <br /> ❑AIV Alarm ❑AN Alarm ❑AN Alarm ❑AN Alarm <br /> Are flow restrictors installed on vent piping? ❑Yes No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> At what level in the tank is the overfill prevention set <br /> to activate?(Inches from bottom of tank.) gj i <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? —1 <br /> Is the overfill prevention in proper operating condition Cit Yes ❑Yes ❑Yes ❑Yes <br /> to respond when the substance reaches the 1CC3appropriate level? No(Specify/y in V.) ❑No(Specify in V.) No(Spedfy in V.) ❑No(Specify�in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention inspection Results Pass ❑Fail ❑Pass E3 Fail 1 ❑Pass C]Fall E3 Pass ❑Fail <br /> V. COMMENTS <br /> Any items marked"Fait'must be explained in this section. Any additional comments 9ftoobsprqv4dedhere. <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> 1 hereby certify that the overfill prevention equipment was inspected in accordaniie' rViik bf.of Regulations,Title 23, <br /> Division 3,Chapter 16, Section 2637.2 and all Information contained herein Is accurate. ;- <br /> UST Service Technician Signature <br /> ales,acct I copes of this page may <br /> ff this facility has more components than this form co Code! Colo,AN=Atxiibb Visual <br /> CERS=CaAkxr4a E,*On nWW Repod5 System,r <br /> ID=iderrtlllratirinn, - Storage Ter*.ICC=hiemational <br />